Commissioning and operation
INTORQ | BA 14.0214 | 10/2019
44
6. Measure the DC voltage at the brake:
– After the over-excitation time (refer to the table ), the measured DC voltage must correspond to the
holding voltage (refer to Assignment: Bridge/half-wave rectifier – brake size). A deviation of ±10 %
is permissible.
7. Check the air gap "s
L
".
8. It must be zero and the rotor must rotate freely.
9. Check the switching status of the micro-switch (siehe to table Switching status of micro-
10. Open the switching contact for the brake.
– The brake is applied.
11. Check the switching status of the micro-switch (siehe to table Switching status of micro-
12. Switch off DC voltage for the brake.
13. Screw the bridges onto the motor terminals.
14. If necessary, remove the neutral conductor from the neutral point (step 2).
Contact type
Connection
Brake released
Micro-switch closed
N/C contact
black / grey
yes
no
no
yes
NO contact
black / blue
yes
yes
no
no
Tab. 10:
Switching status of micro-switch
The preparations for commissioning are completed.
7.1.2
Checking the hand-release
NOTICE
Labeling of drive systems and individual components
¾
The hand-release is designed for activation via a Bowden cable.
¾
An individual brake circuit can only be released electrically.