6
4 Installation
instructions
Fig. 4: Bio reactor
Fig. 5: Clear water tank
1
2
3
4
5
6
7
1
2
4
1.
Drainage inflow
2.
Cable gland back flush pump
3.
Cable gland suction pump
4.
Blower connection 1 ¼“ male
5.
Clear water hose to clear water tank
6.
Emergency overflow
7.
Cable glant float switch BR min
1.
Clear water inflow
2.
Emergency overflow clear water tank
3.
Cable gland floating switch CL max
4.
Cable gland for separate float switch minimum
water level (switching over to potable water (e.g.
using RAINMASTER Eco))
5.
Suctioning clear water to consumers
3
5