Installation sequence:
1.)
Wall installation of control unit and switching power
supply holder
-
Installation instructions (drilled hole distance etc.) are to be
taken from the installation and operating manual of the
AQUALOOP-MS.
2.)
Wall mounting of blower
-
Mounting instructions (distance from drilled hole etc.) are
to be taken from the instruction sheet of the AQUALOOP-
BL30
3.)
Installing pre-filter
- Suction overflow hose is connected to the pipe socket
and secured with a hose clamp.
- Pipe is to be directed internally up to the overflow
connection bush of the bioreactor. Note: first, rub the pipe
with installation lubricant before sliding the pipe in.
- Fit the pre-filter into the overflow connection mounted pipe
collar first.