background image

18

137750_Rev_L    11.16.12

Gas Supply Connection

Connect the gas supply line to the stove, before 

installing the optional Blower. 

 

If the blower will be installed, use a 45° elbow off the 

control valve to create clearance required for the blower 

installation.

The gas supply line connection is made to the left side of 

the valve. The gas supply line should be 3/8” npt with a 

 

1/2” diameter supply, or the appropriate size to provide 

sufficient gas pressure to the valve regardless of the input 

setting. 

The use of Flexible Gas Appliance Connectors is ac-

ceptable in many areas in the U.S. However, Canadian 

methods vary depending on local code.

ALL INSTALLATIONS MUST COMPLY WITH LOCAL CODE 

OR IN THE ABSENCE OF LOCAL CODE, MUST COMPLY WITH 

THE MOST RECENT EDITION OF THE NATIONAL FUEL GAS 

CODE ANSI Z223.1/NFPA 54 OR CAN-B149.

All codes require a gas shut-off valve (gas cock) and 

union, to be installed in the supply line, and in the same 

room as the appliance. This allows for the disconnection 

of the stove for servicing and maintenance. See fig. 27.

 

 









Figure 27.  Supply valve coupling.

Pilot Head

Orifice

Retainer 

Clip

Pilot Base

Figure 25.   Pilot orifice removal and replacement.

14.  Remove the Regulator Tower, Gasket, white plastic 

disk, and Spring.

15.  Install the new regulator: Be sure the new gasket is 

properly positioned and tighten screws securely. 

16.   Install the identification labels to the stove so that 

they can be seen by any person that may be servicing 

the stove. 

Label A: apply to back of stove. 

Label B: apply to stove’s rating plate. 

Small valve Label: apply to valve.

17.  Reassemble the stove, apply gas to the system and 

check for leaks using a soapy  water solution.

18.  Adjust the Air Shutter:   

 

CAUTION! USE WORKGLOVES. SURFACES MAY BE HOT!

 

You will need to adjust the shutter to the position 

that supplies the correct amount of air mixture to 

achieve the best flame picture with your particular in-

stallation. Start with  the shutter stem at the midway 

position in the slot in the bottom of the stove. See fig. 

21. Pushing the stem back will restrict air, while push-

ing it forward will open the shutter. Too much air will 

produce a lighter flame, while too little will promote 

long, dark flames and may promote sooting. Make 

adjustments in small increments. With some experi

-

mentation, you will find the shutter position that 

works best for your installation.

NEVER USE AN OPEN FLAME TO CHECK FOR GAS LEAKS.

 

Correct gas pressure is essential for efficient and 

safe operation of this appliance.  Correct gas pres-

sure must be established at the time of installation. 

For more details, see the Gas Pressure section of this 

manual (page 19).

ALWAYS REFER TO THE LIGHTING INSTRUCTIONS ON THE 

INSIDE BACK COVER OF THIS MANUAL WHEN LIGHT

-

ING YOUR STOVE.

Figure 26.   Regulator assembly.

Apply small 

label here

Remove black  

gasket

Regulator 

Tower

Summary of Contents for Jotul GF 400 DV Sebago

Page 1: ...r future reference QUEFAIRESIVOUSSENTEZUNEODEURDEGAZ Ne pas tenter d allumer l appareil Ne touchez aucum interrupteur Ne pas vous servir des t l phones se trouvant dans le b timent o vous trouvez Appe...

Page 2: ...used Installation shall be in strict compliance with the manufacturer s instructions A copy of the installation instructions must remain with the appliance or equipment at the completion of the instal...

Page 3: ...634 Test Standards This appliance complies with National Safety standards and is tested and listed by Intertek Testing Services of Middleton Wisconsin to ANSI Z21 88 2009 ANSI Z21 88 CSA 2 33 2009 CAN...

Page 4: ...m input Propane 32 000 BTU hr maximum input 16 000 BTU hr minimum input Inlet Pressure MIN MAX Natural Gas 5 0 WC 1 24 kPa 7 0 WC 1 74 kPa Propane 12 0 WC 2 99 kPa 14 9 WC 3 71 kPa Manifold Pressure M...

Page 5: ...tion that is not specifi cally addressed in this manual defaults to local code In the absence of local codes the installation require ments must comply with the current National codes In the U S these...

Page 6: ...adultes doivent tre avertis des dangers des temp ratures de surface lev es et devraient rester l cart pour viter les br lures ou l inflammation des v tements Young children should be supervised while...

Page 7: ...Alcove dimensions result from test configurations not stove clearance specifications Minimum Clearances from the Vent Pipe to Combustibles Horizontal Run Off the top of the pipe 2 51 mm Off the sides...

Page 8: ...ig 7 3 Tighten the lock nut and replace the Top Plate Venting Requirements This appliance may be installed with a vertical or horizon tal termination and must conform to the configuration requirements...

Page 9: ...run at three feet intervals to avoid excessive stress on the offsets Elbows Four 45 or two 90 elbows may be used Do not include the 45 elbow attached to the stove When ever possible use 45 elbows inst...

Page 10: ...cled letter designations in the vent diagram correspond to the Exhaust Restrictor Setting on the stove First determine which vent termination zone is appropriate for your installation and fuel type th...

Page 11: ...TICAL TEMINATIONS ONLY SET STOVE EXHAUST RESTRICTOR TO THE POSITION THAT COR RESPONDS TO THE VENT TERMINATION AREA IN THE DIAGRAM ABOVE OPEN AIR INLET RESTRICTOR FOR TERMINATIONS 5 FT AND UNDER SEE FI...

Page 12: ...the unit and the termination cap A METAL BLOCK OFF PLATE MUST BE CONSTRUCTED AND INSTALLED ABOVE THE UNIT PRIOR TO THE END OF THE INTAKE FLEX AND MUST COMPLETELY SEAL THE CHIMNEY FLUE FROM THE ROOM Co...

Page 13: ...UL 103 or ULC S 629 listed and have a minimum INSIDE diameter of 6 inch es 150 mm Prefabricated chimneys must be listed for the specific Chimney Conversion Kit you choose Figure 15 Vent System through...

Page 14: ...NWARD FROM STOVE TO TERMINATION DOWNWARD VENT RUNS TRAP HEAT AND CAUSE HIGH TEMPERATURES TO DEVELOP WITHIN THE VENT THAT COULD START A FIRE Install a Vinyl Siding Standoff between the vent termi natio...

Page 15: ...ly within 3 feet 90 cm horizontally from the center line of the regulator I Clearance to service regulator vent outlet 3 feet 91 cm minimum J Clearance to nonmechanical air supply inlet to building or...

Page 16: ...HIBITED BY LOCAL CODES THIS APPLIANCE IS ONLY FOR USE WITH THE TYPE OF GAS THAT IS INDICATED ON THE STOVE S RATING PLATE A GAS CONVERSION KIT IS PROVIDED WITH THE GF 400 SEBAGO DIRECT VENT GAS STOVE C...

Page 17: ...low replacement of the Burner Plate 10 Replace the Burner Plate Engage the Air Inlet Tube with the Air Shutter and burner orifice Properly seated the burner plate will be engaged at its front corners...

Page 18: ...d and tighten screws securely 16 Install the identification labels to the stove so that they can be seen by any person that may be servicing the stove Label A apply to back of stove Label B apply to s...

Page 19: ...ons on the inside back cover of this manual or on the stove s rating plate 3 Brush or spray all joints and connections with the soapy water solution 4 If bubbles appear at any connection or seam or a...

Page 20: ...to burn natural gas with the air shutter set half open Be aware however that this initial setting may not provide the optimal flame picture in your particular installation No single setting will be ap...

Page 21: ...Middle Log Figure 37 Install Ember Stones Figure 36 Install Crossover Log PILOT OPENING DO NOT OBSTRUCT The ember stones realistically simulate glow ing coals when the burner is operating These shoul...

Page 22: ...igure 39 Flame appearance on the high setting after approximately 15 to 20 minutes burning WARNING AIR SHUTTER ADJUSTMENTS SHOULD ONLY BE PER FORMED BY A QUALIFIED PROFESSIONAL SERVICE TECHNICIAN Figu...

Page 23: ...is vacuum this area frequently Always keep the appliance area clear and free from combustible materials gasoline and other flammable liquids If a vacuum is used during any service on the stove ALWAYS...

Page 24: ...bled for any reason it should be reassembled and sealed according to the manufac turer s instructions provided at the initial installation Burner and Logset Periodically inspect the Firebox Valve Comp...

Page 25: ...he Blower Bracket to the stove using the two M6 flange head hex bolts as shown in fig 44 4 Attach the Duct Deflectors using the two 7 x 1 2 screws together with the finger guard mounting screws alread...

Page 26: ...nually adjusted with the rheostat knob If the burner turns off the blower will be shut off automatically when the stove cools down If automatic blower circulation is not desired place the blower contr...

Page 27: ...their own against the wall Push them back against the Rear Panel Fig 51 6 Reinstall the Logset See page 21 BE CERTAIN THAT NO EMBERS ARE BLOCKING THE PILOT ASSEMBLY OPENING 7 Replace the Glass Frame...

Page 28: ...Rev_L 11 16 12 Figure 52 Illustrated Parts Breakdown GF 400 DV Sebago GF 400 DV Sebago Illustrated Parts Breakdown Center mount Valve shown used on models after SN 30000 Side mounted Valve uses same c...

Page 29: ...mostat 750003 Remote Control 750002 Floor Bracket Kit 750304 Fuel Conversion Kit to Propane 155351 Fuel Conversion Kit to Natural Gas 155352 37 Firebox Assembly 221960 38 Latch Assembly 220091 39 Reli...

Page 30: ...osts associated with the repair of gas controls plumbing burners log set or sheet metal firebox beyond the warranty period 5 Damage caused by unauthorized modification use or repair 6 Damage to enamel...

Page 31: ...knob Never use tools If the knob will not push in or turn by hand do not try to repair it Call a qualified technician Force or attempted repair may result in a fire or explosion D Do not use this app...

Page 32: ...beginning the installation it is important that these instructions be carefully read and understood J tul maintains a policy of continual product development Consequently products may differ in specif...

Reviews: