Section 1, Overview
Figure 1-2: Oasis™ Heating and Distribution Module
1.4
Critical Factors
THE INSTALLATION SHALL BE IN ACCORDANCE WITH THE
REGULATIONS OF AUTHORITIES HAVING JURISDICTION
The key factors to keep in mind when planning and carrying out the
installation are:
Pay attention to the
notices of “Danger”
“Warning” “Caution”
and “Notice” in this
manual.
•
Mounting location restrictions for the Oasis™ Heating Module,
optional Distribution Module , and exhaust outlet (to reduce
noise, vibration, heat loss, etc.).
•
Length, routing and sizing of fluid lines, fuel lines, air-flow
tubing, exhaust piping and wiring.
•
Unrestricted vent required to draw in 100% outside air for
combustion.
International Thermal Research
1-5
Summary of Contents for Diesel and AC Heating System for Recreational Vehicles and Yachts
Page 14: ...Section 1 Overview 1 8 The Oasis Heating Module...
Page 20: ...Section 2 Mounting the Oasis Heating Module 2 6 The Oasis Heating Module...
Page 28: ...Section 3 Installing the Exhaust System 3 8 The Oasis Heating Module...
Page 32: ...Section 4 Installing the Fuel System 4 4 The Oasis Heating Module...
Page 41: ......
Page 48: ...Section 7 Plumbing the System 7 6 The Oasis Heating Module...
Page 73: ......
Page 74: ...9...
Page 75: ...6 6 6 6 7K 8 0 7 4 7 4 7 8 9 7 8 9 7 8 9 7 8 9 D B 15C 8 D D H D 13 C 8 B B EC 8 D...
Page 76: ...Section 9 Installing the Distribution Module 9 14 The Oasis Heating Module...