7418 East Helm Drive • Scottsdale, Arizona 85260 • 480.948.5555 • www.interfaceforce.com
Oper
at
or Ins
tructions IS
TL T
ension Link v1.2 12-01-2017
Page 1 of 5
1.1
Introduction
This instruction manual refers to the Interface model ITL tension link telemetry options. Before installing or
operating any Interface tension link, this and any reference documents should be read and understood.
In compliance with the Machinery Directive, Interface tension link load cells will be supplied with the following
documents: Instruction Manual and Calibration Certificate.
1.2 Markings CE
Each tension link will be marked with an individual serial number, CE label and the SWL (safe working load) of
the tension link.
1.3 Electromagnetic Compatibility (EMC)
The electromagnetic compatibility of the load cell device can only be assessed in conjunction with the entire
installation, including its control systems. The machine builder who installs this partly completed machinery
into a machine is responsible for compliance with the EMC directive.
1.4
Installation and Operation
To ensure safe and trouble-free installation of the tension link measuring device, the tension link must be
properly transported and stored, professionally installed and placed in operation.
Unpacking
Before removing the tension link, inspect the packaging for signs of damage and immediately inform the
supplier if any damage is found. Unpack the tension link carefully, taking special care with cables and be
aware to the possibility of damaging low-range devices by mishandling. Ensure that calibration and instruction
information is not inadvertently discarded.
Checks Prior to Installation
•
Check that the tension link has been suitably selected for the environment it is being placed into. Any
adverse temperature, corrosive or potentially explosive environments may affect the operational life and
the safety of the product.
OPERATING INSTRUCTIONS
Installation
Tension link load cells are normally classified as portable devices, and so the correct installation is critical to
ensuring product life cycle. To avoid damage or loss of accuracy during installation, the following points should
be followed.
•
The direction of the load applied to a link should be linear as shown in Figure 1.