i N T e N s e
// 1 9
3
4
2
1
C O N N E C T I N G T O P L I N K T O F R O N T T R I A N G L E //
A
Holding top link (#130859) as
oriented in the above picture,
apply grease to the outside face
of each of the top two bearings
in the top link to hold the upper
spacers (#130765) against the
outside bearing race (Image #1).
B
Match upper link to toptube pivot
point, making sure that spacers do
not fall out (Image #2).
C
Using top link collet bolt
(#130842), insert into non drive-
side of frame and push through
the top link then thread into
the frame, taking care that the
spacers do not fall out.
D
Using an 8 mm HEX/Allen
wrench torque to 7 Nm or 60 in/
lbs (Image #3).
E
Grease and insert adjuster cone
(#130807) into top link collet bolt
(#130842). Grease M6 x 22 mm
bolt and install through adjuster
cone into top link collet bolt
(Image #4). Torque M6 x 22 mm
(#410032) to 14 Nm or 125 in/lbs.