Procedure for reconditioning an FCPM

Portable Load Unit troubleshooting 

Portable Load Unit LED states 

Contact Intelligent Energy Product Support

5

7

6

8

For all other issues and questions please contact your local 
Intelligent Energy representative or the Product Support team by email 
[email protected]

To carry out a reconditioning cycle, after the components have been connected 
to the FCPM, as described in Section 4 above, use the following process. It should 
be noted that during reconditioning the FCPM will run loudly and periodically go 
silent for a few seconds. In addition the PLU status LED will occasionally flash orange 
briefly. This is expected and normal behaviour.

 · Start up the FCPM in the normal way (long press, then a short press) 

(See FCPM manual for full startup procedure)

 · Check that the PLU LED is flashing green (the FCPM LED will be flashing green)
 · Verify that the FCPM is running 
 · Allow the FCPM and PLU to operate for 20 minutes (during Reconditioning the 

FCPM will run and the fan will be on high)

 · Press PLU Stop button to switch off the PLU
 · Hold the FCPM button to switch off the FCPM
 · Disconnect PLU and RCD from the FCPM

Fault

Cause

Action

Red flash

Over temperature fault 

1.  Switch unit off
2.  Disconnect FCPM from PLU
3.  Wait for 10mins to cool down 
4.  Restart PLU
5.  If the fault persists Contact Intelligent Energy 

Product Support

Over voltage on 
input fault

LED Colour

LED Mode

Status

Green

Flash

Operational, dissipating power

Amber

Flash

Operational, not dissipating power

Red

Flash

Fault

Any colour

Fast flash

Boot loader fault

RCD port

Regulator interface

Micro SD card slot 
(supplied)

PLU power 
connection 
point

FCPM power output

Customer interface

1

2

3

FCPM reconditioning setup process

4

4.1

4.3

4.2

Mechanical setup for reconditioning

The PLU and FCPM should be located on a stable surface for reconditioning. The 
Hydrogen source should be secured in accordance with local regulations. There should 
be adequate ventilation for operation of the FCPM and cooling air flow of the PLU.

Connection of the Portable Load Unit

The FCPM should be connected from the power out port to the power connection port 
on the PLU, using a standard XT60 power cable.

Connection of the Reconditioning Dongle

The Reconditioning Dongle should be connected to the Reconditioning port 

1

 

on the FCPM.

The FCPM will need the hybrid battery and fuel connections as for normal operation. 
See FCPM manual.

Note:

Summary of Contents for Portable Load Unit

Page 1: ...Portable Load Unit and Reconditioning Dongle User Manual Users must read all instructions provided and retain the manual for future reference Document No 1038842 ...

Page 2: ...lications and use and storage of hydrogen on any sites Intelligent Energy warrants to the recipient and it will repair and replace any defective equipment resulting from the authorised use of the equipment provided Notwithstanding the above Intelligent Energy to the fullest extent permitted by law accepts no liability including liability in respect of any error or defects in the fuel cell system f...

Page 3: ...with an Intelligent Energy Fuel Cell Power Module FCPM and the Reconditioning Dongle RCD The PLU enables the fuel cell stack to be kept at optimal performance especially after periods of non operation To allow the FCPM to be reconditioned to an optimal state the function of both the PLU and RCD should be understood The RCD issues commands to the FCPM which accelerates the reconditioning process Th...

Page 4: ...h off the FCPM Disconnect PLU and RCD from the FCPM Fault Cause Action Red flash Over temperature fault 1 Switch unit off 2 Disconnect FCPM from PLU 3 Wait for 10mins to cool down 4 Restart PLU 5 If the fault persists Contact Intelligent Energy Product Support Over voltage on input fault LED Colour LED Mode Status Green Flash Operational dissipating power Amber Flash Operational not dissipating po...

Page 5: ...com Intelligent Energy Charnwood Building Ashby Road Loughborough LE11 3GB UK www intelligent energy com End of life treatment and disposal EU Declaration of Conformity In accordance with EN ISO 17050 1 2010 9 10 Intelligent Energy Limited of Charnwood Building Holywell Park Ashby Road Loughborough Leicestershire United Kingdom LE11 3GB In accordance with the following Directive s 2014 30 EC The E...

Reviews: