Server System SR1695GPRX Service Guide
41
Figure 24. 3.5 HDD Installation
7. With the black lever in the fully open position, slide the drive assembly into the
server system. The green latch at the front of the drive carrier must be to the right.
Do not push on the black drive carrier lever until the lever begins to close by itself.
8. When the black drive carrier lever begins to close by itself, push on it to lock the
drive assembly into place.
Figure 25. Locking the drive assembly
AF003304
B
A
AF003305
B
A
Summary of Contents for SR1695GPRX
Page 4: ...iv Intel Server System SR1695GPRX Service Guide...
Page 6: ...vi Intel Server System SR1695GPRX Service Guide...
Page 16: ...xviii Intel Server System SR1695GPRX Service Guide...
Page 20: ...xxii Intel Server System SR1695GPRX Service Guide...
Page 33: ...Intel Server System SR1695GPRX Service Guide 13 Server Board Connectors Components...
Page 38: ...18 Intel Server System SR1695GPRX Service Guide...
Page 102: ...82 Intel Server System SR1695GPRX Service Guide...
Page 136: ...116 Intel Server System SR1695GPRX Service Guide Intel Intel Intel Web UL...
Page 137: ...Intel Server System SR1695GPRX Service Guide 117 ITE ITE 5V...
Page 138: ...118 Intel Server System SR1695GPRX Service Guide...
Page 139: ...Intel Server System SR1695GPRX Service Guide 119 ESD ESD ESD ESD ESD...
Page 140: ...120 Intel Server System SR1695GPRX Service Guide...
Page 154: ...134 Intel Server System SR1695GPRX Service Guide...
Page 158: ...138 Intel Server System SR1695GPRX Service Guide...
Page 162: ...142 Intel Server System SR1695GPRX Service Guide...