background image

© Intatec Ltd 2017

23

Installation

   3.  The supply to which the thermostatic shower valve is to be installed must be thoroughly 
        flushed and cleaned to remove any debris, which may have accumulated during the 
        installation. Failure to remove any debris will affect the performance and the manufacturer’s 
        warranty of the product. In areas that are subject to aggressive water, provision must be 
        made to treat the supplies prior to the supplies entering the shower valve.

   4.  The thermostatic shower valve has been designed for horizontal installation and surface 
        mounting. 

   5.  The thermostatic shower valve will be installed in such a position that maintenance of it’s 
        components, associated valves and the commissioning and testing of the shower valve can 
        be undertaken.

   6.  The hot and cold water supplies must be connected to the valve strictly in accordance with 
        the indications on the body of the valve i.e. hot water supply to the hot port of the valve.

   7.  In a situation where one or both of the water supplies are excessive, it is recommended to fit
        a Pressure Reducing Valve to reduce the pressure(s) to within the limits as quoted previously.

   8.  Any thermostatic shower valve must be fitted with a back flow prevention device, such as 
        check valves to prevent the cross contamination of supplies.  The thermostatic shower valve 
        is supplied complete with integral insert check valves and strainers.

   9.  Isolation valves in an accessible position are required as close as is practicable to the water
        supply inlets of the thermostatic shower valve.

  10. The fitting of strainers is recommended as close as is practicable to the water supply inlets of
        the thermostatic shower valve.

  11. It is essential that the fail safe thermostatic shower valve should not be installed in situations 
        where there is a possibility of the valve being deprived of water or where demands for 
        water are greater than the actual stored supplies.

  12. To ensure that the performance levels of the thermostatic shower valve are maintained (in 
        the event of cold water failure), the temperature of the hot water supply at the point of entry 
        to the thermostatic shower valve must be a minimum of 10˚C above the commissioned 
        mixed water discharge temperature.

  13. The fail-safe thermostatic shower valve must not be subject to any extreme temperature 
        variations either during the installation or under normal operating conditions.

Summary of Contents for Kiko DELUXE KIKOD20

Page 1: ...ate as possible We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or otherwise In...

Page 2: ...ealed Shower with ceiling arm and soaker flexible slide rail kit 5 function handset and wall elbow KIKO23 Kiko DELUXE Options Kiko DELUXE Rinse Station with smooth hose and push button hand set KK7000...

Page 3: ...The shower is pre set using ideal conditions to 38 C at the stop with a manual push button override to 46 C can be re set to suit site conditions or user preference see calibration page 13 The maximu...

Page 4: ...hower Valve Item Qty Component 1 1 Valve body and flow controller body 2 1 Flow controller 3 1 Thermostatic cartridge 4 2 Cap and check valve 5 2 Angled male x compression adaptor 6 2 Straight male x...

Page 5: ...aling plate gasket 8 1 Concealing plate 9 2 Sealing ring 10 1 Temperature control concealing sleeve 11 1 Flow control concealing sleeve 12 1 Temperature stop ring 13 1 Flow control stop ring 14 2 Gear...

Page 6: ...Plaster Guard and Insulation 17 18 19 20 21 22 Item Qty Component 17 1 Preformed body insulation shell 18 2 Extension piece 19 1 Thermostatic cartridge extension 20 1 Flow controller cover 21 1 Plast...

Page 7: ...ng cold water prior to the hot water storage vessel This means that the hot and cold pressures can be significantly different Most unvented systems use an inlet manifold located directly after the pre...

Page 8: ...not available a negative head kit may be required to operate the pump Please consult the pump manufacturer s installation requirements Modulating Combi Boiler Instantaneous Gas Water Heater The drawi...

Page 9: ...he vent or a draw off pipe as close as possible to the top of the cylinder For equal tank fed pressures there is no need to fit the flow regulators This installation is the recommended minimum for gra...

Page 10: ...nstalled The supply pipes can come from below above the side or through the wall The shower valve must be installed securely into the wall If not embedded into the wall with plaster the shower valve m...

Page 11: ...s to be fitted see dimension drawing Cavity wall The shower valve must be fixed securely to the structural members of the stud wall and or an additional member may need to be included where the shower...

Page 12: ...20 over the flow control valve and secure with retaining screw 22 Fit the plaster guard 21 over the valve and secure with two retaining screws 22 For a solid wall embed the pipes and shower valve wit...

Page 13: ...rectified before proceeding further Finish tiling the wall around the shower valve Fit the gasket into the concealing plate with a bead of mastic Place the concealing plate and gasket with a bead of m...

Page 14: ...stop ring must align with the temperature position symbol 10 on the temperature control concealing sleeve Refit the gear drive 14 Refit the temperature control knob in the reverse order ensuring that...

Page 15: ...mp cloth followed by a thorough rinsing is all that is required The nozzles in the hand set should be cleaned periodically to remove any build up of debris or deposits which may affect the performance...

Page 16: ...t at cold the showering temperature is too hot The hot and cold supply connections have been made in reverse Thermostatic cartridge movement limited due to lime scale build up The maximum showering te...

Page 17: ...he fitting used should not protrude beyond the surface of the ceiling Other fittings may be required to make the connection between the fitting fixed to the structural member and the water outlet Appl...

Page 18: ...lide Rail Components 1 6 3 2 6 3 8 7 4 5 9 10 11 12 11 Final position Item Qty Component 1 1 Bottom Wall Bracket 2 1 Top Wall Bracket 3 2 Cover 4 1 Flexible Tidy 5 1 Handset Holder 6 2 Screw Plug 7 1...

Page 19: ...6 3 2 6 3 8 7 4 5 9 10 11 12 11 Smooth Hose Item Qty Component 1 1 Bottom Wall Bracket 2 1 Top Wall Bracket 3 2 Cover 4 1 Flexible Tidy 5 1 Handset Holder 6 2 Screw Plug 7 1 Wall plate 8 1 Rail cap 9...

Page 20: ...il 9 and position in the bottom wall bracket 1 Position the upper bracket onto the wall ensuring the rail is vertical Mark round the wall plate 7 onto the wall with a removeable marker Position the wa...

Page 21: ...ns 200 200 250 250 350 350 G B G B G B G B G B G B 15 15 15 15 20 20 170 160 Position of concealing plate adjustable KK70004CP KK70008CP KK70003CP KK70007CP Wall elbow part of KK70001CP rinse station...

Page 22: ...erating outside these conditions cannot be guaranteed by the Scheme to operate as type 2 valves The valves designation of use HP tested against BS EN 1111 For valves designated for use HP only if a wa...

Page 23: ...99 and also be aware of their responsibility and duty of care to ensure that all aspects of the installation comply with the regulations It has been brought to our attention that flushing water system...

Page 24: ...e s to within the limits as quoted previously 8 Any thermostatic shower valve must be fitted with a back flow prevention device such as check valves to prevent the cross contamination of supplies The...

Page 25: ...eratures are established before any attempt to commission 4 Once the supply temperatures are stable and the normal operating conditions are established the shower valve can be commissioned The followi...

Page 26: ...g performance checks shall be carried out 1 Measure the mixed water temperature at the outlet 2 Carry out the cold water supply isolation test by isolating the cold water supply wait for five seconds...

Page 27: ...Intatec Ltd 2017 26 Notes...

Page 28: ...Intatec Ltd 2017 27 Notes...

Page 29: ...Intatec Ltd 2017 28 Notes...

Page 30: ...n Staffordshire ST18 0PF Tel 01889 272 180 Fax 01889 272 181 email sales intatec co uk web www intatec co uk E O E 14 08 17 To activate your product warranty please visit www intatec co uk and click o...

Reviews: