22.
Spring under heavy tension may require adjacent springs to be attached at every four or five holes,
so the spring tension is distributed equally.
23.
Attach the remaining spring until all springs are attached onto the frame.
24.
Lay the cover pad on the outer edge so the springs are covered.
25.
Tie all the cover pad’s strings onto the top rail of the trampoline.