
Pg. 8
V1.0
STEP 2
UPRIGHT BEAM AND REAR CROSS BAR INSTALLATION
Refer to the illustration above for location and orientation of components.
•
Fasten with
Bolt (28)
, at the bottom,
Bolt (29)
above,
Washer (36)
, and
Lock Nut (35)
. Connect
Upright Beam (5)
to the
Bottom Base Frame Assembly.
Left side
and
Right side
. (Refer to the illustration above for placement.)
•
Fasten with
Bolt (29)
,
Washer
(37)
, and
Lock Nut (35)
. Connect the
Rear Cross Bar (3)
to the
Upright Beams (5)
and fasten in place.
Summary of Contents for FPC1C
Page 4: ...Pg 4 V1 0 EXPLODED VIEW...
Page 6: ...Pg 6 V1 0 HARDWARE PACK...
Page 20: ...Pg 4 V1 0 VUE CLAT E...
Page 36: ...Pg 4 V1 0 VISTA DE DESPIECE...
Page 49: ...FPC1C Health In Motion LLC 2020 8...
Page 51: ...3 V1 0 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 35 Health In Motion LLC...
Page 52: ...4 V1 0...
Page 57: ...9 V1 0 3 29 36 35 5 41 2 29 M12 105 4 35 M12 4 36 13 24 2 5 8...
Page 58: ...10 V1 0 4 29 37 36 35 2 41 2 29 M12 105 8 35 M12 8 36 13 24 2 5 8 37 13 37 3 8...
Page 59: ...11 V1 0 5 31 36 35 4 2 23 31 M12 80 4 35 M12 4 36 13 24 2 5 8 41 2...
Page 61: ...13 V1 0 7 12 40 10 11 J 6 7 8 9...
Page 62: ...14 V1 0 J 6 7 1 1 1 2 2 2 3 3 3 10 11 8 9...
Page 65: ...V1 0...