
Pg. 7
V1.0
STEP 1
BOTTOM BASE FRAME ASSEMBLY
Refer to the illustration above for location and orientation of components. This step consists of a
left side
and a
right side
.
•
Fasten with
Bolt (28)
,
Washer (36)
, and
Locknut (35)
. Connect
Bottom Foot Plate (15)
to
Bottom Base Frame (1)
,
Bottom
Inner Plate (13)
, and the
Bottom Cross Brace (14)
, place these items towards the one end of the bottom base frame.
•
Repeat Steps for the Opposite side.
•
Fasten with
Bolt (29)
,
Washer (36)
, and
Locknut (35)
. Connect
Bottom Foot Plate (15)
to
Bottom Base Frame
(1)
, and
Bottom Inner Plate (13)
, place these items towards the one end front of the bottom base frame.
•
Repeat Steps for the Opposite side.
•
Together, these Items form the Bottom Base Frame Assembly.
Summary of Contents for FPC1C
Page 4: ...Pg 4 V1 0 EXPLODED VIEW...
Page 6: ...Pg 6 V1 0 HARDWARE PACK...
Page 20: ...Pg 4 V1 0 VUE CLAT E...
Page 36: ...Pg 4 V1 0 VISTA DE DESPIECE...
Page 49: ...FPC1C Health In Motion LLC 2020 8...
Page 51: ...3 V1 0 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 35 Health In Motion LLC...
Page 52: ...4 V1 0...
Page 57: ...9 V1 0 3 29 36 35 5 41 2 29 M12 105 4 35 M12 4 36 13 24 2 5 8...
Page 58: ...10 V1 0 4 29 37 36 35 2 41 2 29 M12 105 8 35 M12 8 36 13 24 2 5 8 37 13 37 3 8...
Page 59: ...11 V1 0 5 31 36 35 4 2 23 31 M12 80 4 35 M12 4 36 13 24 2 5 8 41 2...
Page 61: ...13 V1 0 7 12 40 10 11 J 6 7 8 9...
Page 62: ...14 V1 0 J 6 7 1 1 1 2 2 2 3 3 3 10 11 8 9...
Page 65: ...V1 0...