insize ISH-MRD200 Operation Manual Download Page 3

3

4

Picture 2

f  Install the weight:

Attention: Do no connect to power when installing the weight. 
1) Take out the weights from the accessary box(There is A, B, 
C marked on the weights)

2) Rotate the test force dial to 588N, then take out the derrick 
and remove the nut.

Picture1

100

490

15

0

Ø70~80

Attention:

   

If test sample height over 40mm, it is necessary to make a 

circular hole with 70~80mm diameter to make the the lifting screw 
move up and down smoothly. The limited position of the screw 
going down is 220mm below the stage, and nothing in this area. 
The place of the hole is against the base as per picture 2 shows.

      e. open the up cover and back cover after fixed the hardness 
tester, remove the galloon and bungee which used to fix the 
tester. And loosen the case of lifting screw, rotate the lifting 
handwheel to make screw go down, then take out the shockproof 
pads, and put on the stage. 

fix

 

l

ifting

 

handwheel fix the header bar

 

fix the farmar derrick

fix the lever

 

3) Put the weight A to the derrick, then tight the nut and put the 
derrick to the original place

4) Put weight B and C to the corresponding position.

5) Change the loading and observe if the weights put in to the 
grooves, it is working well when weights move smoothly. 

16. lever

17. derrick hole 

18. derrick

19. outrigger

20. weight C

21. 

B

weight 

22. 

A

weight 

23. nut

16

17

18

19

20

21

22

23

Reviews: