www.insigniarange.com
Last Modified: 08/02/2018
17
Step 8
Ensure the back panels are square and you are happy with their final position.
Now meet the front frame to the side panels as per the image and screw together using
the
ST14
screws and
SW9
washers. We recommend
Rubbergum
is placed under the
front frame to add to the rigidity of the shower and the overall sealing.
before finally securing it in position to aid with the sealing of the shower.