background image

 

www.insigniarange.com

 

Last Modified:27/01/2017

 

 19 

Silicone Seal where shown in red on the inside of the shower

 

TESTING FOR WATER LEAKS

 

LEAVE THE SHOWER 24 HOURS AFTER BUILD TO ALLOW SEALENT TO CURE AND ENSURE 

THE SHOWER IS AWAY FROM ITS FINAL POSITION TO ALLOW REAR VIEWING

 

Ensure all connections are tight and sealed including the waste, body jets and steam outlet (model 

dependent) on your shower.

 

Switch on the overhead shower NOT the massage jets, remember these will fire water out at you 

and are not suitable for checking leaks as they would normally only operate when a person is in 

front of them. DO NOT AIM THE HAND SHOWER AT THE JOINTS OF YOUR SHOWER AS THIS 

DOES NOT FALL UNDER 

NORMAL EVERYDAY USE

”. 

Adjust the feet to ensure the  direction of 

the water flows towards to the waste to prevent puddling.

 

Just use COLD water setting as hot will make cabin misty and condensate thus the inspection be-

comes very difficult. Now on the OUTSIDE of the shower inspect each joint, factory seal, hose, clip 

and jet by walking from one side and going around to the back and then to the other side finishing at 

the front. If you have a small leak (normally caused through insufficient sealer or air bubble on as-

sembly, dry the area thoroughly and reseal.

 

Please remember the location of the water may not be exactly where the leak is as it could have run 

around to a low point. Never seal your inner fittings unless necessary, remember you will see this 

for the life of the shower! Again leave to cure and check. Once you are happy check the shower 

functions i.e. jets for back massage, foot massage and finally hand shower (model dependent) 

check your joints to these functions at the rear again. Never use the shower until 

all

 checks have 

been made and the installer is 100% happy in the knowledge no leaks are present. 

 

All good?

 

Now push your shower FROM THE BASE and NEVER THE GLASS OR FRAME into its final resting 

position.

 

Happy Showering! 

Summary of Contents for GT9014

Page 1: ...alling Email customerservice insigniarange co uk Replacements Parts inside of your warranty contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO __________________________ to claim your full 5 year warranty register your shower within 90 days at www insigniarange co uk warrantyreg aspx ...

Page 2: ...tion Electrical Requirements What s In The Boxes Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Sealing and Water Testing Control Panel Instructions Help Book Information Parts List 3 5 7 8 9 10 11 18 19 20 21 22 ...

Page 3: ...any years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your finish OUR BADGE RATING IN TERMS OF DIFFICULTY OF ASSEMBLY IS BASED ON CLIENT FEEDBACK 1 Badge Very easy 2 Badges Easy 3 Badges Moderate 4 Badges Harder than average 5 Badges Professional skills requi...

Page 4: ...CTION TO HOUSE MAINS WHEN YOUR ITEM IS ASSEMBLED ALWAYS USE THE SERVICES OF A FULLY QUALIFIED ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERTAKEN YOURS AND OTHERS SAFETY IS PARAMOUNT NEVER ATTEMPT THIS YOURSELF REMEMBER These showers are designed to...

Page 5: ...ed two methods 1 Connect within current laws and IP directives using plug and RCD provided with steam version or supply one for non steam version 2 Preferred Wire into isolated fused feed connecting directly to the house consumer service box Remove the fitted plug and ensure the Consumer unit has capabilities to replace RCD feature if RCD is removed Always use protection against electrical surge Y...

Page 6: ...Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints Not Supplied Not Supplied Not Supplied Hardware Requirements A Hydro Massage Shower requires 2 x 1 Metre Braided Hose Not Supplied ...

Page 7: ... how the unit is assembled When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build take the unit apart and carry out the final fix What s In The Boxes Tray Box 1x Tray 1x Roof 2x Curved Rails 1 x AC DC 12V Adapter Glass Room 2x Door seals 2x Glass doors 2x fixed glass Backwalls...

Page 8: ...lacement missing parts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code Description Quantity SP097 Door Handles 2 SP006 Chrome Door Wheels 8 ST20 20mm Screws 20 ST35 35mm Screws 10 ST13 14mm Screws 6 ST25 25mm Screws 10 PRC20 Retaining Clips 4 DB6 Drill Piece 1 Note In some ca...

Page 9: ...er plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a combi supply please use a pressure reducing valve if required to lower the BAR pressure to the shower Please Remember that this product is free standing and is designed to be pulled away from the wall Th...

Page 10: ...www insigniarange com Last Modified 27 01 2017 10 ...

Page 11: ...m is for the steam generator drainage and will be con nected in the instructions later Now please level the tray by firstly placing the tray in its final location and then using a spirit level adjust the tray feet accordingly Once you are happy with the levelling of the tray you can pull it out to begin the main construction Step 1 Attach the uprights to the top and bottom curved rail using the ST...

Page 12: ...y in place you can secure the outer edges of the glass in to position using the glass retaining clips PRC20 as shown in the image To do this simply align the clips tight up to the glass and using screw type ST13 screw in to position Do this for all 4 clips 2 x top and 2 x bottom Step 2 Take the 2 x pieces of flat side glass and run the plastic seal down 1 side of each piece and cut to length if re...

Page 13: ...fer it up to the tray and align to the front glass Once you are happy with the overall position remove the back wall and run a bead of silicone under the bottom of the back wall and place back on the tray This will add to the water tightness once finished Using Screw type ST20 attach the back wall to the front glass framework as shown above ...

Page 14: ...www insigniarange com Last Modified 27 01 2017 14 Step 6 Screw the back wall to the tray using screw type ST25 ...

Page 15: ...le wheels to the top and bottom of the glass doors and ensure the wheels are at their lowest position and hang on the inner curved rails with the wheels facing the outside of the glass Once all wheels are fitted and on the rails you can adjust the wheels by turning the plastic bolt clockwise in which in turn will pull the wheels towards the track ensuring a secure a tight fit Now grease the track ...

Page 16: ...bly in the shower holder Accessory Installation Monsoon Head Attach the grey hose from your valve to the inner black tube using PTFE tape please note this only needs to be hand tight Over tightening will snap damage the inner black tube Handle Ensuring that the inner thread is protruding out from the handle far enough place the handle on the outside of the door and secure by tightening the inner c...

Page 17: ...evice output may differ from the image Please refer to your outer chrome faceplate in side your Insignia shower as a reference point IF YOUR DIAL DOES NOT CORROSPOND TO THE APPROPRIATE DEVICE Turn on your water to the shower and note which output the water exits from then turn off the water and swap over the relevant hose Alternatively remove the outer chrome knob by removing the chrome cap and lo...

Page 18: ...arange com Last Modified 27 01 2017 18 Electric Box Connections Connect the cables below to the corresponding devices on the shower Roof Light Fan Speaker Antenna Back Lights RJ11 Phone Connection 12V power Supply ...

Page 19: ...sty and condensate thus the inspection be comes very difficult Now on the OUTSIDE of the shower inspect each joint factory seal hose clip and jet by walking from one side and going around to the back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on as sembly dry the area thoroughly and reseal Please remember the...

Page 20: ...Instructions Button 1 VOL Volume Up Button 2 Down Arrow Radio Search Down Button 3 Up Arrow Radio Search Up Button 4 VOL Volume Down Button 5 Power On Off Button 6 Telephone Answer telephone Button 7 FM Radio On Off Button 8 LIGHT On Off Button 9 FAN On Off 1 2 3 4 5 6 7 8 9 ...

Page 21: ...www insigniarange com Last Modified 27 01 2017 21 Need Help If so then simply download Insignia s free comprehensive help and troubleshooting brochure now Simply visit www insigniarange co uk help aspx ...

Page 22: ...s Part Code Part Description SP300 Waste hose HOSE1MBB 1M braided hose w blue band HOSE1MBR 1M braided hose w red band SP221 Drain Hose SP024 Transformer SP308 Magnetic door seals SP310 Rear door seals SP089 SP095 SP044 SP151 SP043 3 Port 2 Feed Thermo static valve 3 Port Selector Cartridge 46mm Stem On Off Water Mixer Valve 18mm Dia 43mm Stem Push Fit Thermostatic Cartridge Type 1 Plastic Thermos...

Page 23: ...e used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All images are registered with ImageTraker Insignia is a registered trademark of Maclean International Ltd ...

Reviews: