4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
0.1Mpa(14.5Psi).
6). Set the 3-way valve to the closed position
immediately
Do this quickly so that the gauge ends up
indicating 0.3Mpa(43.5Psi) to 0.5 Mpa(72.5Psi).
Disconnect the charge set, and tighten the
2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves
service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way
valves are set to the closed position.
2). Connect the charge set and a charging
cylinder to the service port of the 3-way valve
Leave the valve on the charging cylinder closed.
3). Air purging.
Open the valves on the charging cylinder and
the charge set. Purge the air by loosening the
flare nut on the 2-way valve approximately 45’
for 3 seconds then closing it for 1 minute; repeat
3 times.
After purging the air, use a torque wrench to
tighten the flare nut on the 2-way valve.
4). Check the gas leakage
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Close the valve on the charging cylinder and
discharge the refrigerant by loosening the flare
nut on the 2-way valve approximately 45’ until
the gauge indicates 0.3Mpa(43.5Psi) to 0.5
Mpa(72.5Psi).
6). Disconnect the charge set and the charging
cylinder, and set the 2-way and 3-way valves to
the open position
Be sure to use a hexagonal wrench to operate
the valve stems.
7). Mount the valve stems nuts and the service
port cap
Be sure to use a torque wrench to tighten the
service port cap to a torque 18N.m.
Be sure to check the gas leakage.
6.7 Re-installation while the outdoor unit
need to be repaired
1. Evacuation for
the whole system
Procedure:
1). Confirm that both the 2-way and 3-way
valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve’s
service port.
3). Evacuation for approximately one hour.
Confirm that the compound meter indicates
-0.1Mpa(14.5Psi).
4). Close the valve (Low side) on the charge set,
turn off the vacuum pump, and confirm that the
gauge needle does not move (approximately 5
minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the
vacuum pump.
24
Innovair Corporation
Nexxos Inverter
Summary of Contents for NIN1225C2V31
Page 6: ...2 2 Part names of Indoor Outdoor units 4 Innovair Corporation Nexxos Inverter ...
Page 13: ...5 Wiring Diagram 5 1 Indoor Unit NIN516C2V31 ID 11 Innovair Corporation Nexxos Inverter ...
Page 14: ...NIN522C2V31 ID 12 Innovair Corporation Nexxos Inverter ...
Page 15: ...NIN1225C2V31 ID 13 Innovair Corporation Nexxos Inverter ...
Page 16: ...5 2 Outdoor Unit NIN516C2V31 OD 14 Innovair Corporation Nexxos Inverter ...
Page 17: ...NIN522C2V31 OD 15 Innovair Corporation Nexxos Inverter ...
Page 18: ...NIN1225C2V31 OD 16 Innovair Corporation Nexxos Inverter ...
Page 19: ...For NIN516C2V31 OD 17 Innovair Corporation Nexxos Inverter ...
Page 20: ...For NIN522C2V31 OD 18 Innovair Corporation Nexxos Inverter ...
Page 21: ...For NIN1225C2V31 OD 19 Innovair Corporation Nexxos Inverter ...
Page 39: ...9 2 Outdoor unit error display For NIN516C2V31 OD 37 Innovair Corporation Nexxos Inverter ...
Page 49: ...P U P V 47 Innovair Corporation Nexxos Inverter ...
Page 50: ...P W P N 48 Innovair Corporation Nexxos Inverter ...