MU8002-012ENEU rev03
15
IMPORTANT:
Always open the manhole guard to its full capacity before installing davit
arm.
3.
A)
Remove both handle pins from their locations.
B)
Install the receptacle of the davit
arm on the integrated mast of the manhole guard.
4.
A)
Lock all with the first handle pin.
B)
Install the inferior leg of the davit arm between
the eyelets of the manhole guard and lock with the second handle pin.
C)
If neces-
sary, install the anti-toppling device A2108-18 through the eyelets on each side of the
manhole guard and lock with the pin.
5.
Install the lifeline cable or rope or winch on mounting bracket
made to accept the hoisting device, and lock with pin attached to
the SRL or winch bracket.
6.
A second lifeline can be installed on the grey “D” anchor point.
7.
Pass the lifeline cable or rope into the pulley located at the top
end of the davit arm. Make sure that the lifeline cable or rope is
well in place.
Summary of Contents for XTIRPA IN-8002
Page 22: ...MU8002 012ENEU rev03 22 NOTES...
Page 23: ...MU8002 012ENEU rev03 23 NOTES...