
11
INSTALLATION
2.6 Hydraulic connections
The engineer is responsible for choosing the right water lines
and their size, in accordance with good installation practices
and the applicable law.
Keep in mind that undersized pipelines lead to poor sys-
tem operation and/or a loss of thermal and cooling per-
formance.
Position and dimensions
Models
m.u.
400
600
800
Hydraulic connections
“ EK
3/4
3/4
3/4
Pipelines minimum diameter
mm
14
16
18