14
Inis
Meain
MK2
Roomheater
stove
and on any part of the flue pipe should
be
152.4mm
MAXIMUM.
If
the
flue
needs
to
carry
in
any
particular
direction
greater
than
152.4mm,
the
flue
should
rise
at
45
degrees
to
the
horizontal
so
as
to
prevent
the
degradation
of
the
draught.
90
degree
bends
must
be
avoided
in
the
flue
system.
The
flue
collar
and
the
blanking
plate
have
sealing
rope
fitted
to
them
and
must
be
checked
that
they
are
fully
tight
before
fitting.
The
installer
must
ensure
that
the
chimney
and
or
flue
system
is
installed
correctly
as
Inis
Stoves
is
not
responsible
for
incorrect
installation.
Soot doors
Where
the
flue
is
installed
from
the
rear
flue
outlet,
the
use
of
a
soot
door
is
necessary
for
proper
sweeping
of
the
chimney
and
removal
of
the
soot.
Adequate
access
to
the
soot
door
is
necessary.
The
soot
door
may
be
placed
in
the
existing
block
work
or
on
a
suitable
register
plate
between
the
flue
pipe
and
the
chimney.
Initial firing pre-check
Before
firing
the
stove
for
the
first
time
points
to
check
for
after
installation
are,
1.
Inspect
the
ash-pit
and
firebox
of
the
stove
to
ensure
all
the
various
grate
components
and
fire
bricks
did
not
become
dislodged
during
transport
and
fitting.
2.
Check
that
the
chimney
is
sound
and
clear.
3.
The
room
has
vents
as
described
above.
4.
That
all
the
sealing
joints
have
had
time
to
set
properly.
5.
That
all
door
seals
etc.
are
correct
and
present.
6.
That
the
damper
is
operational
and
working
properly.
7.
That
all
installation
guidelines
have
been
adhered
to.
8.
That
all
local
national
and
European
guidelines
and
laws
have
been
followed.
Initial firing
The
first
fire
should
be
quite
small
to
ensure
prompt
extinguishing
of
the
fire
in
the
event
of
a
problem.
The
user
manual
contains
details
on
how
to
start
a
fire
in
the
stove.
Issues
to
check
for
once
the
stove
is
alight
are,
1.
That
no
fumes
are
being
emitted
into
the
room,
2.
That
a
window
is
open
in
the
room
to
remove
fumes
from
the
paint
on
the
stove
being
emitted.
Please
see
the
paint
curing
procedures
in
the
user
manual.
Commissioning and
handover.
Once
the
initial
fire
and
the
correct
operation
of
the
stove
have
been
established,
the
user
must
be
instructed
on
the
proper
operation
and
maintenance
of
the
stove.
Answer
any
queries
or
issues
the
user
may
have
and
seek
advice
from
Inis
Stoves
with
regard
to
any
issue
you
may
not
be
in
a
position
to
answer.
Advice
the
user
to
fill
out
and
post
the
Guarantee
card
that
came
with
the
stove
Package Content
1.
Fireplace
:
1
unit
2.
Heat
resistant
gloves
:
1
pair
3.
Instruction
manual
:
1
unit
4.
Wooden
pallet
:
1
unit
Summary of Contents for Meain MK2
Page 16: ...16 Inis Stoves 2010 ...