Inis Mor MK2 Boiler stove
10
Installation Manual
Specification
Output Kw
Water Kw
28
21
Flue Dia mm
180
Flue Gas Tempera-
ture
287
Fuel
Wood, eco
fuels, peat
dried,
smokeless
coal
Min distance to
combustibles
Rear mm
Sides mm
150
250
CO @ 13%O2 %
0.19
Stove Mass
KG
310
Max Hearth Temp
57
Installation Instructions
The heat outputs as shown above were ob-
tained using well-seasoned hardwood us-
ing a refuelling time of 1.5 hrs.
The wooden crating the stove was shipped
in can be cut up for fuel in the stove.
Health and Safety precau-
tions
Please ensure that the installation of
the stove complies with all the require-
ments of the relevant Health and safety
at work acts applicable.
Some materials used in fire cement are
caustic and contact with the skin should
be avoided. In case of contact with the
skin wash with plenty of cold water.
If any structural work is required for
installation please take note of the
possible presence of asbestos. If the
presence of asbestos is found please
contact a registered asbestos removal
firm.
Combustion and ventila-
tion air requirements
Proper air supply must be insured to the
room into which the stove is to be in-
stalled. A permanent vent opening with a
minimum free area of 135 cm sq. must be
present and ensure that the vent cannot
be blocked for example by fallen leaves
and that any grills that fit the vent do
not lessen the cross section of the
vent.
Under no circumstances should there be
an extractor fan in the same room as the
stove, to avoid the possibility of com-
bustion gases being drawn into the room.
When deciding on where to place a vent,
the installer must ensure that the posi-
tion will not cause undue air currents