
ABV2012IQM01_ - Installation and Operation Manual
•
Connect several chargers to each other, forming a “chain”. Each charger must be connected to the
chargers closest to it.
Ethernet bridges
3.5. Installation of the STAND element (optional)
1. Prepare the ground anchors for the STAND element according to the figure, always using M12
components.
20.5 cm
15.5 cm
20
Installation
Ingeteam