Once configured the OCPP general parameters, OCPP should be enabled in case it isn’t already enabled,
and restart.
Access System > Startup and proceed depending on the situation. Below the different situations’ procedure.
The above image refers to a charging point where OCPP 1.5 is running. The procedures depending on what it
wants to be made are the following:
1. OCPP 1.5 already running and just configured some parameters:
a. Click on ocppdv15 > Restart
2. OCPP 1.5, running, but want to start OCPP 1.6
a. Click on ocppdv15 > Disable
b. Click on ocppdv15 > Stop
c. Click on ocppdv16 > Enable
d. Click on ocppdv16 > Start