![Ingersoll-Rand Thermo King Cold Cube Operator'S Manual Download Page 27](http://html1.mh-extra.com/html/ingersoll-rand/thermo-king-cold-cube/thermo-king-cold-cube_operators-manual_2059991027.webp)
ColdCube Operation
26
Pre-Cooling Load
Pre-cool or freeze goods before putting them in the ColdCube.
The ColdCube is designed to maintain product temperature,
not to pull down product temperature.
Pre-Cooling ColdCube
The ColdCube is a highly insulated unit designed to maintain
product temperature with minimal electrical consumption. The
ColdCube is not designed for fast temperature pull down. You
may need to pre-cool or pre-freeze an empty ColdCube for
several hours to reach the setpoint temperature before loading
product.
Cleaning and maintenance
Occasionally clean the inside of the ColdCube with a damp
cloth. Dry the ColdCube with a cloth after cleaning.
Defrost
The ColdCube is not designed for automatic defrosting. If
excess frost builds up, clean out the frost.
CAUTION: Danger of electrocution! Always
disconnect the mains plug before you clean and
service the ColdCube.
CAUTION: Danger of damaging the ColdCube! Do
not wet the electronic components. They are not
water proof!
CAUTION: Danger of damaging the ColdCube! Do
not use abrasive cleaning agents or hard objects
during cleaning as these can damage the ColdCube.
Never use brushes, scouring pads or hard or pointed
tools to remove ice or to loosen objects which have
frozen in place.
Summary of Contents for Thermo King Cold Cube
Page 3: ...2...
Page 13: ...Unit Description 12...
Page 19: ...ColdCube Installation 18...
Page 33: ...Unit Specifications 32...