26
18-GJ06D2-2E-EN
Table 13.
Braze the Refrigerant Lines (continued)
4.
Connect, but do not braze field line set to indoor coil.
a.
Allow a minimum of 1.5 inches of refrigerant line set
before using an elbow coupling.
Important:
Service access to the auxiliary heater must
remain unobstructed.
1.5” MIN
Important:
Heat Sensitive Sensor. The temperature Sensor must be
removed or a wet rag must be wrapped around the
suction line between the Sensor and the braze joint to
protect the Sensor from failure due to overheating.
5.
Braze refrigerant line connections.
a.
Pull back the insulation before brazing the suction line.
b.
Wrap the Gas Temperature Sensor (GT) with a wet rag.
c.
Braze the refrigerant line connections.
Note:
The suction line must be insulated prior to brazing the line set
to the air handler stubs.
We t Ra g o n Ga s Te m p e ra tu re S e n s o r (GT)
R
Re
effrriig
ge
erra
an
ntt L
Liin
ne
e B
Brra
azziin
ng
g