Installation
RT-SVX058B-EN
17
3. Install the vent hood on the gas heat panel using the
screws removed in
. Make sure it is properly
secured on to the panel.
Condensate Drain Configuration
An evaporator condensate drain connection is provided
on each unit. Refer to the unit overview figure in
location.
A condensate trap must be installed at the unit due to the
drain connection being on the “negative pressure” side of
the fan.
A condensate drain line must be connected to the P-Trap.
Pitch the drain lines at least ½-inch for every 10 feet of
horizontal run to assure proper condensate flow. Do not
allow the horizontal run to sag causing a possible double-
trap condition which could result in condensate backup
due to “air lock”.
Filter Installation
Each unit ships with 2-inch filters installed. The quantity of
filters is determined by unit size. Access to the filters is
obtained by removing the filter access panel.
Refer to the unit Service Facts (shipped with each unit) for
filter requirements.
Note:
Do not operate the unit without filters.
Field Installed Power Wiring
An overall dimensional layout for the standard field
installed wiring entrance into the unit is illustrated in
. To insure that the unit’s supply
power wiring is properly sized and installed, follow the
guidelines outlined below.
Note:
All field installed wiring must conform to NEC
guidelines as well as state and Local codes.
Verify that the power supply available is compatible with
the unit’s nameplate ratings. The available supply power
must be within 10 percent of the rated voltage stamped on
the nameplate. Use only copper conductors to connect the
power supply to the unit.
Note:
If the unit is not equipped with an optional factory
installed nonfused disconnect switch or circuit
breaker, a field supplied disconnect switch must be
installed at or near the unit in accordance with the
National Electrical Code (NEC latest edition).
Main Unit Power
Standard Wiring
The electrical service must be protected from over current
and short circuit conditions in accordance with NEC
requirements.
Figure 13.
Vent hood shipping location
Figure 14.
Vent hood installation
NOTICE:
Use Copper Conductors Only!
Unit terminals are not designed to accept other types of
conductors. Failure to use copper conductors could
result in equipment damage.
WARNING
Proper Field Wiring and Grounding
Required!
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state electrical codes. Failure to
follow code could result in death or serious injury.