32
C950 PLANNING & INSTALLATION MANUAL
TP0029 Rev5
Ó
2000 Ingersoll-Rand Company
Date of Revision: 15 August, 2000
o
Check piping on condensate traps (piped to open drain).
o
Check compressor lubricant, motor lubricant, & coupling grease for conformance to
specifications.
o
Fill oil reservoir to "Normal" level.
o
Check anchor bolts and grouting.
o
Check unit level.
o
Check electrical power supply to unit.
o
Check all control panel connections per applicable schematics.
o
Manually rotate compressor and driver shafts, checking for free, uncoupled, rotation with
prelube pump running and seal air ‘on’.
o
Check driver per manufacturer's instructions found in the individual unit's Operation
Manual.
o
Check driver electrical connections.
o
Check direction of rotation and magnetic center of main drive on motor driven units prior
to coupling to compressor.
o
Align driver to compressor.
o
Install coupling spacer and lubricate coupling per manufacturer's instructions.
o
Check rotation of prelube pump (three phase only).
o
Check clearances on thrust bearings. Disregard if the access covers are wire sealed.
o
Check lubrication system for oil leaks.
o
Check operation and calibration of the inlet and bypass valves per the Operation
Manual.
01_
40 of 41
90.10_Pre-Installation and Operation Manual