EN-2
80167604_ed1
EN
After each 20,000 cycles
, or as experience indicates, drain and refill the Impulse Unit
Drive Assembly using the Fluid Replacement Kit (Part No. EQ106S-K400). Lubricate the
hex drive and the output shaft before assembly.
Torque Adjustment
To adjust the torque on these Twin Blade Impulse Wrenches, proceed as follows:
1. Remove the Adjustment Hole Plug.
2. Rotate the Drive Shaft until the Torque Adjustment Screw is visible in the opening.
3. Using a 1.5 mm hex wrench, rotate the Adjustment Screw
clockwise
to increase the
torque output and
counter-clockwise
to decrease the torque output. Do not rotate the
Oil Plug.
4. Replace the Adjustment Hole Plug.
NOTICE
Make all final adjustments at the job.
Parts and Maintenance
When the life of the tool has expired, it is recommended that the tool be disassembled,
degreased and parts be separated by material so that they can be recycled.
The original language of this manual is English.
Tool repair and maintenance should only be carried out by an authorized Service Center.
Refer all communications to the nearest
Ingersoll Rand
Office or Distributor.
Summary of Contents for 45P3-EU
Page 27: ...80167604_ed1 EL 2 EL PMAX 16585747 2 20 000 EQ106S K400 1 2 3 1 5 mm 4 1 5 2 6 3 7 4 8 9...
Page 28: ...EL 3 80167604_ed1 EL Ingersoll Rand...
Page 46: ...RU 2 80167604_ed1 RU PMAX 16585747 2 20000 EQ106S K400 1 2 3 1 5 4 1 6 2 7 3 8 4 9 5...
Page 47: ...80167604_ed1 RU 3 RU Ingersoll Rand...
Page 50: ...Notes...
Page 51: ...Notes...