6
Unpacking and Visual Inspection
U N P A C K I N G I N S T R U C T I O N S
Open the shipping container and carefully remove the analyzer from the container and packing materials.
Inspect the instrument for any signs of damage, such as a broken window or bent conduit. Unscrew the
explosion-proof window and remove it from the enclosure. Remove the display board from its
supporting brackets and lay it down outside of the enclosure.
Inspect the inside of the analyzer. Check all electrical connections, such as ribbon cables and connectors
for proper mating to the PC Boards. Check the gas sample lines from the bulkhead fittings to the optical
bench for integrity. If all internal components look proper, replace the display board and screw the front
window securely in place.
Remove the junction box cover. Inspect the fuse and terminal board. The cover can be left off for
installation purposes.
R E P O R T I N G D A M A G E
Should there be any apparent damage to the instrument inside or out, which has occurred due to
shipping and handling, notify both the shipper and Infrared Industries immediately. If there is any visual
damage to the shipping container or packing material these items should be saved for inspection by the
shipper.
Summary of Contents for IR-8400D
Page 1: ...IR 8400D Continuous Gas Monitoring Analyzer ...
Page 2: ......
Page 4: ...3 ...
Page 6: ...5 ...
Page 8: ...7 ...
Page 12: ...11 ...
Page 14: ...13 ...
Page 16: ...15 Figure 2 IR 8400D Outlying Dimensions ...
Page 28: ...27 ...
Page 36: ...35 ...