EonStor CS Installation Guide
page 18 / 97
Installation Guide
5. Attach one cage nut (
08
) to the front rack post. The cage nut secures the enclosure in place..
6. Open the covers from the left and right ears of the enclosure, then lift the enclosure and align
it with the slide rails on the rack, keeping the pressure even on both sides. Slowly push the
enclosure to the rack and fasten one 35 mm. M5 crosshead screw (
07
) on each side of the
Summary of Contents for EonStor GS 5000
Page 35: ...EonStor CS Installation Guide page 35 97 Installation Guide...
Page 60: ...EonStor CS Installation Guide page 60 97 Installation Guide...
Page 62: ...EonStor CS Installation Guide page 62 97 Installation Guide...
Page 69: ...EonStor CS Installation Guide page 69 97 Installation Guide...
Page 71: ...EonStor CS Installation Guide page 71 97 Installation Guide...
Page 80: ...EonStor CS Installation Guide page 80 97 Installation Guide...
Page 83: ...EonStor CS Installation Guide page 83 97 Installation Guide...
Page 91: ...EonStor CS Installation Guide page 91 97 Installation Guide...
Page 95: ...EonStor CS Installation Guide page 95 97 Installation Guide Contact Information...