87
Power Connections
Once all hard drives have been properly installed and the I/O ports or management
interfaces have been connected, the system can be powered on.
Checklist
BEFORE
powering on the system, please check the following:
CBM:
Make sure the CBM has been properly installed before
powering-on the system.
Hard drives:
Hard drives are correctly installed in the drive trays.
Drive trays:
All the drive trays, whether or not they contain a hard drive,
have been installed into the system.
Cable connections:
The system has been correctly connected to host
computer(s), management computers, or external networking devices.
Ambient temperature:
All system components have been acclimated
to the surrounding temperature.
NOTE
Make sure you use the power cables provided that are at least 1.2 meters in length.
DO NOT
use extension cables as the power cables are designed to connect
ONLY
and DIRECTLY
to relocatable power taps (RPTs) on server cabinets.