A S S E M B L I N G
-
2 × D O U B L E ( T W O E M I T T E R S ) H E AT E R S J O I N E D
1.
Take the first heater and place it face down on a flat surface.
2.
Take the second heater and place it face down and positioned parallel to the first heater.
3.
Push the bolts used to hold the wall brackets through the hole in the brackets on the rear
heaters and slide a shake
-
proof washer on all the threads from the protruding side.
4.
Slide the joining bars on each bolt and fit a washer and nut
–
do not fully tighten at this
point.
5.
Ensure the second heater is still parallel to the first and sitting flat.
6.
Slide the joining bars on each protruding bolt of the other heater to connect them
together and fit the washers and nuts.
7.
Again, ensuring the heaters remain flat, fully tighten all four nuts to secure the joining
bars in place.
When two Alpha H2 heaters are joined they should only be hung from a ceiling on
chains
-
do not wall mount!
Always allow the heater to cool before attempting to reposition/move. Never attempt to
move the heater while it is switched on!
Observe the minimum safe distance between the heater body and inflammable
surfaces and objects when mounting.
Please refer to Table 1 for the recommended
positioning of the heater with regards to
minimum distances. Do not install the heater in a
corner!
Keep out of the reach of children.
1.
Please refer to Table 1 for recommended
positioning of the heater. When hanging from a
ceiling two chains of equal length and gauge are
required and should be selected with fixings that are
adequate to hold the weight of the heater. If in doubt
contact a professional for advice!
Continued on next page...
8
C A U T I O N
Switch off/unplug the heater from the mains supply when mounting or adjusting the
heater position.
C H A I N H A N G I N G
-
2 × D O U B L E ( T W O E M I T T E R S ) H E AT E R S J O I N E D
Fig. E
S
E
E
T
A
B
L
E
1
F
O
R
M
IN
IM
U
M
D
IM
E
N
S
IO
N
S