background image

Owner’s Manual | 

Desktop Open Frame 2 Post Rack 10-3

2

 Threaded Frame 2 Post Rack 

4

      

 

NavePoint.com

         

2. RACK ASSEMBLY

Assemble Front Base to Left and Right Base 

Attach Front Base (A) to the Left Base (D) and Right Base (E) and secure them with  

2 of the M6*12mm Screws (G) and 2 of the M6 Flange Nuts (H) using a Phillips Screwdriver 

(not included). 

Assemble Left and Right Vertical Rail 

Attach Left Vertical Rail (B) and Right Vertical Rail (C) to the frame built above and secure 

them with 8 of the M6*12mm Screws (G) and 8 of the M6 Flange Nuts (H) using a Phillips 

Screwdriver (not included).

Reviews: