![Infineon R 48V BATT Switch10 Manual Download Page 8](http://html1.mh-extra.com/html/infineon/r-48v-batt-switch10/r-48v-batt-switch10_manual_2055114008.webp)
User Guide
8 of 46
Rev. 1.0
2022-03-09
48V Battery Switch Reference Design
R 48V BATT Switch10
System and functional description
2
System and functional description
2.1
Getting started
Connecting supply and load
The 48 V supply has to be connected to the M6 screw terminals marked “BAT+” and “BAT- “. The BAT- terminal
is the ground reference of the board. The load is connected to the screw terminals marked “LD+” and “LD-“.
For driving high currents use properly sized cables and cable lugs. Use a maximum 9 Nm mounting torque for
tightening the nuts on the screw terminals.
Figure 4
Connecting supply and load
Note:
Note: Please ensure the right supply polarity as there isn’t any reverse polarity protection
implemented.
Connecting the microcontroller
To connect the XMC4700 Relax Lite Kit to the power board use the provided flat ribbon cable as shown in
Figure 5
Connecting the microcontroller board to the power board