![Inciner8 i8-75a Installation & Operation Manual Download Page 12](http://html.mh-extra.com/html/inciner8/i8-75a/i8-75a_installation-and-operation-manual_2051113012.webp)
Inciner8 Limited. Company Registered in England & Wales - REG: 04866401
VAT Registration: 855999544
Enter the world of:
www.inciner8.com
+44 (0) 1704 884020
Leading Provider of Thermal Treatment Solutions
Assembly
STEP 3 - Gas Connections
Please consult an experienced and qualified gas engineer before attempting any gas installations.
ONLY A QUALIFIED GAS
ENGINEER CAN CARRY OUT
THIS STEP. DO NOT ATTEMPT
THIS IF YOU ARE
IN-EXPERIENCED
Please note
You will need to connect these hoses to the fuel supply using 1/4” BSP (British Standard Pipe) male fittings, the supplied
hoses have 1/4” BSP female fittings. Ensure fuel supply is sufficient to give fuel pump feeding pressure of 12-15 bar
when using light oil.