Step 13: Y-Axis Motor + Limit Switch Wiring
Step 14: Gantry Cable Carrier Hose Install
Feed all wires from Z-Axis assembly through (E8 Short) cable hose
to electronics assembly, clip into cable mounts and close
Route (E17) + (E19) wires to cable ties mounts (E13) to electronics
end plate ready for connecting up later. Cable tie wires to (E13)
E19
E19 (x1)
E17
E17 (x1)
E8 (x1)
E8
43
Summary of Contents for ARCMILL
Page 1: ...Assembly Instruction Guide 03 06 2019 Version 1 3 ...
Page 4: ...Base Frame Assembly 3 ...
Page 14: ...Gantry Upright Assembly 13 ...
Page 18: ...Gantry Beam Assembly 17 ...
Page 23: ...Z Axis Assembly 22 ...
Page 36: ...Complete Assembly 35 ...