![Inception Machines ARCMILL Assembly Instruction Manual Download Page 21](http://html.mh-extra.com/html/inception-machines/arcmill/arcmill_assembly-instruction-manual_2051101021.webp)
Step 5: Electronics Enclosure Mounting
Step 6: Cable Carrier Mounts Install
Attach cable carrier mounts (E10 and E11) to gantry beam using
(F6 and F1) fixings, use approximate spacing R to L (55,115,95mm)
F23 (x3)
E11 (x1)
E10
F23 (x4)
F9 (x4)
E4 (x1)
Slide (F23 ) nuts into gantry beam slots, mount enclosure (E4) onto
gantry beam using (F9) screws
F23
F9
E4
F1
Remove right cover of electronics
assembly (E4) and remove
controller board prior to assembly
E11
F6
F23
E10 (x2)
F6 (x2)
F1 (x3)
20
Summary of Contents for ARCMILL
Page 1: ...Assembly Instruction Guide 03 06 2019 Version 1 3 ...
Page 4: ...Base Frame Assembly 3 ...
Page 14: ...Gantry Upright Assembly 13 ...
Page 18: ...Gantry Beam Assembly 17 ...
Page 23: ...Z Axis Assembly 22 ...
Page 36: ...Complete Assembly 35 ...