STEP 3 (See Diagram 3)
A.) Attach the Leg Developer (#7) to the open bracket on Front Post (#5). Secure it with
one M8 x 2 5/8” Allen Bolt (#31), two Ø 5/8” Washers (#37), and one M8 Aircraft Nut
(#40).
B.) Attach the pivot on Arm Curl Handle to the open bracket on Leg Developer. Use the L-
shaped Lock Pin (#23) to lock it in position.
DIAGRAM 3
7
Summary of Contents for MARCY MCB-379
Page 11: ...10 ...