background image

5

1-1

SI

NO

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

1

 BOILER 

INSTALLATION

1.1 INSTALLATION 

RECOMMENDATIONS.

The Victrix Zeus Superior ErP boiler has been 

designed for wall mounted installation only; for 

heating and production of domestic hot water for 

domestic use and similar purposes.

The place of installation of the appliance and 

relative Immergas accessories must have suitable 

features (technical and structural) such to allow 

(always in safety, efficiency and comfortable 

conditions):

-  installation (according to the provisions of the 

technical legislation and technical regulations);

-  maintenance operations (including scheduled, 

periodic, routine and special maintenance);

- removal (to outdoors in the place for loading 

and transporting the appliances and compo-

nents) as well as their eventual replacement 

with appliances and/or equivalent components.

The wall surface must be smooth, without any 

protrusions or recesses enabling access to the 

rear part. They are not designed to be installed 

on plinths or floors (Fig. 1-1).

By varying the type of installation the classifica-

tion of the boiler also varies, precisely:

Type B

23

 or B

53

 boiler if installed using the 

relevant terminal for air intake directly from 

the room in which the boiler has been installed.

Type C boiler

 if installed using concentric 

pipes or other types of pipes envisioned for 

sealed chamber boilers for air intake and expul-

sion of flue gas.

Note:

 appliance classification is provided in the 

depictions of the various installation solutions 

shown on the following pages.
Only professionally enabled companies are 

authorised to install Immergas gas appliances.

Installation must be carried out according to 

regulation standards, current legislation and in 

compliance with local technical regulations and 

the required technical procedures.

Before installing the appliance, ensure that it is 

delivered in perfect condition; if in doubt, contact 

the supplier immediately. Packing materials (sta-

ples, nails, plastic bags, polystyrene foam, etc.) 

constitute a hazard and must be kept out of the 

reach of children. If the appliance is installed in-

side or between cabinets, ensure sufficient space 

for normal servicing; therefore it is advisable to 

leave clearance of at least 3 cm between the boiler 

casing and the vertical sides of the cabinet. Leave 

adequate space above the boiler for possible water 

and fume removal connections. At least 60 cm 

must be left below the boiler in order to assure 

replacement of the magnesium anode. Keep 

all flammable objects away from the appliance 

(paper, rags, plastic, polystyrene, etc.).

Do not place household appliances underneath 

the boiler as they could be damaged if the safety 

valve intervenes with an obstructed conveying 

system (the safety valve must be conveyed away 

by a draining funnel), or if there are leaks from 

the hydraulic connections; on the contrary, the 

manufacturer cannot be held responsible for 

any damage caused to the household appliances.

For the aforementioned reasons, we recommend 

not placing  furnishings, furniture, etc. under 

the boiler. 

In the event of malfunctions, faults or incorrect 

operation, turn the appliance off and contact an 

authorised company (e.g. the Authorised Tech-

nical Assistance centre, which has specifically 

trained staff and original spare parts). Do not 

attempt to modify or repair the appliance alone.

Failure to comply with the above implies personal 

responsibility and invalidates the warranty.
• Installation regulations: 
  - this boiler can be installed outdoors in a 

partially protected area. A partially protected 

area is one in which the appliance is not 

exposed to the direct action of the weather 

(rain, snow, hail, etc..).

  - Installation in places with a fire risk is pro-

hibited (for example: garages, closed parking 

stalls), gas appliances and relative flue ducts, 

flue exhaust pipes and combustion air intake 

pipes.

  - Installation is prohibited on the vertical 

projection of cooking hobs.

  - Installation is also prohibited in places/en-

vironments that constitute common parts of 

office condominiums such as stairs, cellars, 

entrance halls, attics, lofts, escape routes, 

etc. if they are not located inside technical 

compartments under the responsibility of 

each individual building and only accessible 

to the user (for the features of the technical 

compartments, see the technical standards in 

force).

Attention:

 wall mounting of the boiler must 

guarantee stable and efficient support for the 

generator

The plugs (standard supply) are to be used only in 

conjunction with the mounting brackets or fixing 

template to fix the appliance to the wall;

 they only 

ensure adequate support if inserted correctly (ac-

cording to technical standards) in walls made of 

solid or semi-hollow brick or block. In the case of 

walls made from hollow brick or block, partitions 

with limited static properties, or in any case walls 

other than those indicated, a static test must be 

carried out to ensure adequate support.

N.B.: the hex head screws supplied in the blister 

pack are to be used exclusively to fix the relative 

mounting bracket to the wall.

These boilers are used to heat water to below 

boiling temperature in atmospheric pressure.

They must be connected to a central heating 

system and hot water circuit suited to their 

performance and capacity.

"Anti-legionella" heat treatment of the Immergas 

storage tank (activated by the specific function 

present on the predisposed thermoregulatory 

systems): during this stage, the temperature of 

the water inside the storage tank exceeds 60°C 

with a relative risk of burns. Keep this domestic 

water treatment under control (and inform 

the users) to prevent unforeseeable damage 

to people, animals, things. If required install a 

thermostatic valve on the domestic hot water 

outlet to prevent scalding.

YES

NO

Summary of Contents for VICTRIX ZEUS SUPERIOR

Page 1: ...VICTRIX ZEUS SUPERIOR 26 2 32 2 ERP Instruction and recommendation booklet IE 1 037935ENG...

Page 2: ......

Page 3: ...ofessionals within the dimensional limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions...

Page 4: ...e 20 2 2 General warnings 20 2 3 Control panel 20 2 4 Description of functioning states 21 2 5 Using the boiler 22 2 6 Troubleshooting 23 2 7 Parameters and information menu 25 2 8 Boiler shutdown 26...

Page 5: ...a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer cannot be held responsible for any damage caused to the household appliances For the aforementio...

Page 6: ...uid must be followed scrupulously regarding the percentage neces sary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollution...

Page 7: ...et the system requirements es tablished by the technical regulation in force in relation to the pollution of drinking water we recommend installing the IMMERGAS anti backflow kit to be used upstream o...

Page 8: ...t to On Off mode CAR V2 Super CAR or On Off chrono ther mostat electrical connection Optional The operations described below must be performed after having removed the voltage from the appli ance Any...

Page 9: ...efore varies according to applica tions for air intake or flue exhaust Each single component has a resistance corresponding to a certain length in metres of pipe of the same diameter the so called equ...

Page 10: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric intake exhaust terminal 60 100 vertical Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m...

Page 11: ...in the female end with lip seal of the 80 flange unit until it stops Introduce the gasket making it run along the bend Fix it using the sheet steel plate and tighten by means of the straps present in...

Page 12: ...with the boiler flange and tighten using the screws supplied with the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female side of the bend 2 up to the end stop makin...

Page 13: ...cal length of 14 4 m including the terminal This configuration corresponds to a resistance factor of 100 In this case specific extensions must be requested Vertical kit with aluminium tile 80 125 Kit...

Page 14: ...oth in the female side of the bend 5 up to the end stop ensuring that the internal and external wall sealing plates are fitted Fit the exhaust pipe 9 with the male side smooth to the female side of th...

Page 15: ...ical data The dimensions of the shafts must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the shaft 30 mm for circular section shafts and 20 mm in the event of a...

Page 16: ...he chimney technical slot The maximum possible length of the 80 rigid ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in ex...

Page 17: ...gas may come out the condensate drain after a few minutes operation check that this no longer occurs This means that the drain trap is filled with conden sate to the correct level preventing the passa...

Page 18: ...he system flow and return accord ing to set value K Fixed 100 65 in this mode the cir culator works at constant speed the operating range is defined between minimum 65 and maximum 83 for Victrix Zeus...

Page 19: ...e functioning possibilities Cover kit on request If installed outdoors in a partially protected place with direct air intake it is compulsory to mount the appropriate top protection cover for the corr...

Page 20: ...horised local firm 2 2 GENERAL WARNINGS Never expose the wall mounted boiler to direct vapours from cooking hobs Use of the boiler by unskilled persons or children is prohibited For safety purposes ch...

Page 21: ...uest for domestic hot water or central heating in order to evacuate residual flue gas F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heating in order...

Page 22: ...ection it decreases During domestic hot water heating DHW ON appears on the display 24 on the status indicator 6 and at the same time as the burner ignites the flame presence indicator switches on 8 w...

Page 23: ...pressure is between 1 1 2 bar and restore the correct pressure if necessary 12 Storage tank probe anomaly The board detects an anomaly on the storage tank probe The boiler cannot produce domestic hot...

Page 24: ...flame signal This occurs when the boiler is ignited correctly and the burner flame switches off unexpectedly a new ignition attempt is performed and if normal conditions are restored the boiler does...

Page 25: ...els of the menu and the choice of parameters is confirmed Press button C to go back one level M1 information menu This menu contains the various information relative to boiler functioning 1st Level Bu...

Page 26: ...i freezeliquidandinstallation of the Immergas Anti freeze Kit in the boiler In the case of prolonged inactivity second case we also recommend that disconnect the electric power supply fully drain the...

Page 27: ...production of domestic hot water check sealing efficiency of water circuits check ventilation and or aeration of the instal lation room where provided If even only a single safety check offers a negat...

Page 28: ...ed by the drain trap being blocked Check by means of the condensate drain cap that there are no residues of material blocking the flow of condensate Noise due to air in the system Check open ing of th...

Page 29: ...casing mounted while the gas valve calibration operations must be carried out with the casing open and disconnecting the boiler from the power supply Calibration of the minimum CO2 minimum heating pow...

Page 30: ...on the domestic hot water probe on entry to the boiler P54 2 Displays the temperature read on the domestic hot water probe on exit from the boiler P54 3 Displays the temperature read on the return pr...

Page 31: ...in the cylinder falls by 3 C with respect to the temperature set Solar function deactivated P71 1 P71 2 5 C Boiler ignition for heating the domestic hot water occurs when the water contained in the cy...

Page 32: ...rts the pump at least once every 24 hours for the duration of 30 seconds in order to reduce the risk of the pump becoming blocked due to prolonged inactivity 3 11 THREE WAY ANTI BLOCK FUNCTION Both in...

Page 33: ...that it is properly fixed to the combustion chamber lid otherwise it must be replaced Visually check that the water safety drain valve is not clogged Check that after discharging system pressure and b...

Page 34: ...wer grid 1 by taking out the 4 fastening screws 2 Open the control panel door 3 remove the 2 white screw caps 4 and take out the 2 fasten ing screws 5 tilt the panel towards you Unscrew the 2 6 fasten...

Page 35: ...0 92 9 4 0 81 1 28 13 1 9 0 7740 1 00 0 73 7 4 0 75 0 77 7 9 0 73 1 09 11 1 8 0 6880 0 89 0 59 6 0 0 67 0 64 6 5 0 66 0 90 9 2 7 0 6020 0 78 0 46 4 7 0 59 0 52 5 3 0 58 0 73 7 5 6 0 5160 0 67 0 35 3...

Page 36: ...0 7 670 11 270 7 NOX at 0 of O2 at Q Nom Min mg kWh 39 22 108 50 43 30 Flue temperature at nominal output C 78 86 79 Flue temperature at minimum output C 73 82 75 Victrix Zeus Superior 32 2 ErP Gas no...

Page 37: ...h 25 8 22188 32 0 27520 Domestic hot water adjustable temperature C 10 60 10 60 Domestic hot water circuit flow limiter at 2 bar l min 8 7 12 6 Domestic hot water circuit min pressure dynamic bar 0 3...

Page 38: ...Cod Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn...

Page 39: ...ns 60 C on return and 80 C on flow Low temperature mode for condensation Boilers means 30 C for low temperature boilers 37 C and for other appliances 50 C of return tempera ture Model s Victrix Zeus S...

Page 40: ...mestic hot water function AFC 18 GJ Seasonal room heating yield s 92 Domestic hot water production yield wh 82 Parameter value Yearly energy consumption for the heating function QHE 61 2 GJ Yearly ele...

Page 41: ...ementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C F...

Page 42: ...35 C From fiche of heat pump The energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficien...

Page 43: ...y electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123 131 130 150 160 170 163 188 200 213 M L XL XXL 3 2 3 2 The energy ef...

Page 44: ...Water heating energy efficiency under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Aux...

Page 45: ...45...

Page 46: ...46...

Page 47: ...47...

Page 48: ...mmergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 037935ENG rev ST 001312 001 09...

Reviews: