BOILER START-UP (INI-
TIAL CHECK)
To commission the boiler:
- make sure that the declaration of conformity
for installation is supplied with the appliance;
- make sure that the type of gas used corresponds
to boiler settings;
- check connection to a 230V-50Hz power
mains, correct L-N polarity and the earthing
connection;
- make sure the central heating system is filled
with water and that the pressure gauge indicates
a pressure of 1-1.2 bar.
- make sure the air valve cap is open and that the
system is well deaerated;
- switch the boiler on and check correct ignition;
- check the ∆p gas values in domestic hot water
and central heating modes;
- check the CO
2
in the fumes at maximum and
minimum flow rate;
- check activation of the safety device in the event
of no gas, as well as the relative activation time;
- check the intervention of the main switch
located upstream of the boiler and in the boiler;
- check that the intake and/or exhaust terminals
are not blocked;
- ensure activation of all adjustment devices;
- seal the gas flow rate regulation devices (if set-
tings are modified);
- check the production of domestic hot water;
- check sealing efficiency of water circuits;
- check ventilation and/or aeration of the instal-
lation room where provided.
If even only a single safety check offers a negative
result, do not commission the system.
3.1 PLUMBING DIAGRAM.
Key:
1 - Condensate drain trap
2 - Stainless steel coil for storage tank
3 - Magnesium anode
4 - Stainless steel storage tank
5 - Gas valve
6 - Gas valve outlet pressure point (P3)
7 - Air/gas Venturi manifold
8 - Fan
9 - Gas nozzle
10 - Detection electrode
11 - Condensation module
12 - Air intake pipe
13 - Fumes hood
14 - Manual air vent valve
15 - Flue probe
16 - Air sample point
17 - ∆p gas pressure point
18 - Flue sample point
19 - Flow probe
20 - Safety thermostat
21 - Burner
22 - Ignition electrodes
23 - Condensation module cover
24 - Venturi negative sign (P2)
25 - Venturi positive sign (P2)
26 - Return probe
27 - System expansion vessel
28 - Boiler circulator pump
29 - Adjustable by-pass
30 - System pressure switch
31 - System draining valve
32 - Three-way valve (motorised)
33 - Domestic hot water probe
34 - 3 bar safety valve
35 - System filling valve
36 - D.H.W. expansion vessel
37 - 8 bar safety valve
38 - Cold water inlet non-return valve
39 - Storage tank unit draining valve
G - Gas supply
SC - Condensate drain
AC - Domestic hot water outlet
AF - Domestic cold water inlet
R - System return
M - System flow
Summary of Contents for VICTRIX ZEUS SUPERIOR
Page 1: ...VICTRIX ZEUS SUPERIOR 26 2 32 2 ERP Instruction and recommendation booklet IE 1 037935ENG...
Page 2: ......
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...