background image

Key:

  V  -  Electrical connection

  G  -  Gas

  U  -  Domestic hot water outlet

  E  -  Domestic water inlet

  R  -  System return

  M  -  System delivery

  S  -  Condensate drain (min. internal diameter Ø 13mm)

Important: wall mounting of the boiler must guarantee stable 

and efficient support for the generator. e plugs supplied 

standard with the appliance ensure adequate support only if 

inserted correctly (according to technical standards) in walls 

made of solid or cavity bricks. For walls made from bricks or 

cavity blocks, partitions with limited static properties, or in 

any case walls other than those indicated, a static test must 

be carried out to ensure adequate support. ese boilers are 

used to heat water to below boiling point at atmospheric 

pressure. ey must be connected to a heating system and 

domestic water circuit suitable for their performance and 

output. Moreover, they must be installed in a place where 

the temperature cannot fall below 0°C. ey must not be 

exposed to atmospheric agents.

385 Victrix 27

350 Victrix 20

1

  BOILER 

INSTALLATION

1.1  Installation instructions.

Immergas  gas  appliances  must  be  installed  exclusively 

by  a  professionally  qualified  and  authorised  technician. 

Installation must be carried out according to the standards, 

current legislation and in compliance with local technical 

regulations and the required procedures. Before installing the 

appliance, ensure that it is delivered in perfect condition; if 

in doubt, contact the supplier immediately. Packing materials 

(staples, nails, plastic bags, polystyrene foam, etc.) constitute 

a hazard and must be kept out of the reach of children. If 

the appliance is installed inside or between other cabinets or 

furniture, ensure sufficient space for normal maintenance; a 

clearance of 2÷3 cm between the boiler casing and the sides 

of the cabinet is recommended.

Keep all flammable objects (paper, rags, plastic, polystyrene, 

etc.) away from the appliance. In case of anomalies, faults or 

imperfect operation, the appliance must be deactivated; call a 

qualified technician (e.g. the Immergas Technical Assistance 

Centre, which has specific technical expertise and original 

replacement parts). Never attempt to modify or repair the 

appliance alone. Failure to observe the above implies personal 

responsibility and invalidates the warranty.

•  Installation standards: these boilers are designed exclusively 

for wall-mounted installation; they must be used for heat-

ing rooms and the production of domestic hot water and 

similar uses. e wall surface must be smooth, without 

any protrusions or cavities enabling access to the back 

part. ey are NOT designed for installation on plinths 

or floors (see fig.).

1.2   Main dimensions.

Height (mm)

Width (mm)

Depth (mm)

850

450

350 - Victrix 20
385 - Victrix 27

CONNECTIONS

GAS

DOMESTIC 

HOT WATER

SYSTEM

G

U

E

R

M

1/2”

1/2”

1/2”

3/4”

3/4”

3

INST

ALLER

USER

TECHNICIAN

Summary of Contents for VICTRIX ZEUS 20

Page 1: ...GB Instruction booklet and warning Installer User Technician VICTRIX 20 27...

Page 2: ...with the appliance It must be kept in a safe place and read carefully as it contains important information to ensure safe installation use and maintenance Installation and maintenance must be performe...

Page 3: ...ns 18 2 3 Control panel 19 2 4 Restoring heating system pressure 20 2 5 Draining the system 20 2 6 Anti freeze protection 20 2 7 Casing cleaning 20 2 8 Decommissioning 20 3 Boiler start up preliminary...

Page 4: ...quired procedures Before installing the appliance ensure that it is delivered in perfect condition if in doubt contact the supplier immediately Packing materials staples nails plastic bags polystyrene...

Page 5: ...manufacturer declines any responsibility in case of flood ing if the drain valve cuts in Important to preserve the life and efficiency of the domestic circuit exchanger it is advisable to install the...

Page 6: ...on In addition to the functions described in the previous point the Remote Friend Control enables the user to have under control and at hand all the important information regarding appliance and heati...

Page 7: ...set on the Remote Friend Control only if the boiler main switch is turned to Domestic Remote Friend Control Important If the Remote Friend Control is used arrange two separate lines in compliance with...

Page 8: ...tor of the single component does not depend on the type of boiler on which it is installed and is a dimen sional value It is based on the temperature of fluids passing through the ducts and therefore...

Page 9: ...ncentric horizontal intake exhaust 60 100 Intake and exhaust 9 1 4 m Intake and exhaust 5 2 0 8 m Equivalent length in metres of pipe 80 Terminal complete with concentric vertical intake exhaust 60 10...

Page 10: ...t length in metres of pipe 60 Equivalent length in metres of pipe 80 Complete vertical exhaust terminal 60 for ducting Intake 2 2 Exhaust 1 9 Intake 1 9 Exhaust 2 6 Intake 1 2 Exhaust 1 6 Exhaust 3 3...

Page 11: ...boiler inserting the seal 1 not requiring lubrica tion positioning it with the round protrusions downwards in contact with the boiler flange and tighten using the screws supplied with the kit Fit the...

Page 12: ...levant internal and external rings are fitted Fit the male end smooth of the exhaust pipe 9 up to the stop on the female end of the bend 5 making sure that the internal ring is fitted this will ensure...

Page 13: ...system Green Range 60 mm rigid and 80 flexible ducting systems can only be used for domestic use and with Immergas condensing boilers In any case ducting operations must respect the provisions contai...

Page 14: ...s be suitably designed to prevent the possible freezing of condensate inside the fume system and condensate dis charge system trap passivator tank comply with the current relevant national and local r...

Page 15: ...ollowing must be done for boiler start up check gas supply circuit tightness with the 0n Off valve closed and subsequently open with gas valve closed no gas flow must be read on the meter for 10 minut...

Page 16: ...pen adjustment screw fully unscrewed Head kPa A Flowrate l h B C Head m H 2 O Polyphosphate dispenser kit by request e polyphos phate dispenser prevents the formation of scale and preserves the origin...

Page 17: ...with seat for Venturi 13 Electronic control unit 14 Overtemperature safety thermostat 15 Circulating pump 16 Plate type heat exchanger 17 Pump safety pressure switch 18 3 bar safety valve 19 3 way val...

Page 18: ...Electronic control unit 14 Overtemperature safety thermostat 15 Circulating pump 16 Plate type heat exchanger 17 Pump safety pressure switch 18 3 bar safety valve 19 3 way valve monobloc 20 Adjustabl...

Page 19: ...ctrical water and gas supplies In case of work or maintenance to structures located in the vicinity of ducting or fume extraction devices and relevant accessories switch off the appliance and after co...

Page 20: ...iler on Stand by an illuminated horizon tal segment appears on the display In case of malfunction or anomaly the temperature is replaced by the relative error code flashing 1 Ignition block 2 Block du...

Page 21: ...an antifreeze function that starts the pump and the burner when the system water temperature inside the boiler falls below 4 C e anti freeze function is guaranteed if the boiler is fully operative and...

Page 22: ...Control or Room ermostat e boiler is arranged for application of a Room thermostat or the Remote Friend Control C A R Connect the Room ermostat to terminals 40 and 41 and remove jumper X20 e Remote Fr...

Page 23: ...el PTC S1 Main rotary switch S2 Pump flow switch microswitch S3 Domestic circuit priority microswitch T1 Voltage transformer TA Room thermostat On Off optional U1 Rectifier inside gas valve connector...

Page 24: ...stat 18 Automatic air valve 19 Igniters 20 Expansion tank 21 Air intake pipe 22 Circulating pump 23 Circulating pump pressure switch microswitch 24 One way valve 25 Circulating pump pressure switch 26...

Page 25: ...hood 19 Air analyzer chamber 20 p gas pressure point 21 Fume analyzer chamber 22 NTC limit and heating control sensor 23 Overtemperature safety thermostat 24 Automatic air valve 25 Igniters 26 Expansi...

Page 26: ...f CO2 in the fumes with boiler at min output with respect to the following table seal the gas flow regulation devices if the settings are modified after completing conversion apply the sticker include...

Page 27: ...11 Combustion parameters check For max and min heat output adjustment insert the differential manometer between P1 and P2 see fig on page 23 24 for measuring the gas pressure Bring the boiler to chimn...

Page 28: ...the system return water is below 4 C the boiler starts up and functions until reaching 42 C 3 17 System delivery temperature too high By operating the jumper 5 page 28 two delivery temperature ranges...

Page 29: ...mode jumper 5 Heating temperature preselection range 6 RS 232 computer interface VK 4115 V gas valve for Victrix 20 Electronic card 7 Output for fan rpm measurement 8 Max heating power adjustment trim...

Page 30: ...DUNGS gas valve for Victrix 27 Key 1 Gas valve inlet pressure point 2 Gas valve outlet pressure point 3 Off Set adjustment screw 12 Outlet gas flow regulator 29 INSTALLER USER TECHNICIAN...

Page 31: ...he screws 1 on the bottom of the casing front pull the bottom of the casing front outwards while at the same time pushing upwards see fig undo the screws 2 on the top of the casing front support sheet...

Page 32: ...k activation of the device against no gas ionization flame control ensure intervention time is less than ten seconds Visually check for water leaks or oxidation from on con nections and traces of cond...

Page 33: ...14 1 78 18 1 1 12 2 60 26 5 12 0 10320 1 32 1 69 17 3 0 98 1 30 13 3 0 97 1 90 19 4 10 0 8600 1 11 1 23 12 6 0 82 0 91 9 3 0 81 1 40 14 3 8 0 6880 0 89 0 84 8 6 0 67 0 60 6 1 0 66 0 90 9 2 6 0 5160 0...

Page 34: ...low limiter rated delivery min pressure Domestic circuit min pressure dynamic Domestic circuit max working pressure D specific delivery according to EN 625 Drawing capacity in continuous operation T 3...

Page 35: ...x working temperature heating circuit Adjustable heating temperature Pos 1 Adjustable heating temperature Pos 2 Total volume heating expansion tank Heating expansion tank precharge Generator water cap...

Page 36: ...www immergas com ISO 9001 Certified Company is instruction booklet is made of ecological paper Cod 1 021298 Rev 15 017635 000 04 04...

Reviews: