background image

16

1

2

3

3

3

4

5

6

7

6 8

9

A

10

11

12

12

1-24

1-23

A

B

A
C

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

Kit composition:

Ref.

Q

ty

Description

1

1

Door adaptor 

Ø

 100 or 

Ø

 125

2

1

Door gasket made of neoprene

3

4

Screws 4.2 x 9 AF

4

1

Hex headed screw M6 x 20

5

1

Flat nylon washer M6

6

2

Door hole closure metal-sheet plate 

plug

7

1

Plug gasket made of neoprene

8

1

Toothed washer M6

9

1

Nut M6

10 1 (kit 80/125) Concentric gasket 

Ø

 60-100

11 1 (kit 80/125) Flanged adapter 

Ø

 80-125)

12 4 (kit 80/125) Hex headed screws M4 x 16 slotted

-

1 (kit 80/125) Bag of lubricating talc

Installation drawings key:

Unique identification of the component in 

the kit
Identification of the component not supplied 

in this kit

1

A

Supplied separately:

Ref.

Q

ty Description

A

1

Ducting kit door

Rigid 

Ø

 80 

ducting 

 (A) 

mm

SHAFT

(B) mm

SHAFT

(C) mm

86

126

146

Flexible 

Ø

 80 

ducting 

(A) 

mm

SHAFT

(B) mm

SHAFT

(C) mm

90

130

150

Rigid 

Ø

 60 

ducting 

(A) 

mm

SHAFT

(B) mm

SHAFT

(C) mm

66

106

126

1.16 ADAPTOR C9 KIT INSTALLATION. 

This kit allows an Immergas boiler to be installed 

in "C

93

" configuration, with combustion air intake 

directly from the shaft where the flue gas exhaust 

is, obtained by means of a ducting system.

System composition.

The system must be combined with the following 

components (sold separately) to be functional 

and complete:

- kit C

93

 

Ø

 100 or 

Ø

125 version

- ducting kit 

Ø

 60 or 

Ø

 80

- fumes exhaust kit 

Ø

 60/100 or 

Ø

 80/125 con-

figured according to the installation and type 

of boiler.

Kit Assembly.

-  Mount the components of kit "C9" on the door 

(A) of the ducting system (Fig. 1-24).

- (Version 

Ø

 125 only) mount the flanged adap-

tor (11) interposing the concentric gasket (10) 

on the boiler, fitting it with the screws (12).

- Mount the ducting system as described in the 

relative instructions sheet.

-  Calculate the distances between the boiler drain 

and the bend of the ducting system.

-  Prepare the boiler flue system, making sure that 

the internal pipe of the concentric kit is fitted 

properly in the bend of the ducting system 

(quota "X" fig. 1-25), while the external pipe 

must be fitted on the adaptor until it stops (1).

 N.B.:

 to encourage the removal of possible 

condensate forming in the exhaust pipe, tilt 

the pipes towards the boiler with a minimum 

slope of 1.5%.

-  Mount the cover (A) complete with adaptor (1) 

and caps (6) on the wall and assemble the flue 

system to the ducting system.

N.B.:

 (version 

Ø

 125 only) before assembly 

check the gaskets are in the right position. In 

the event component lubrication (already car-

ried out by the manufacturer) is not sufficient, 

remove the residual lubricant using a dry cloth, 

then to ease fitting coat the parts with common 

or industrial talc.
Once all components have been assembled prop-

erly, the exhaust fumes will be expelled via the 

ducting system; the combustion air for normal 

boiler operation will be aspirated directly by the 

shaft (Fig. 1-25).

Technical data.

- The dimensions of the shafts must ensure  a 

minimum gap between the outer wall of the 

smoke duct and the inner wall of the shaft: 30 

mm for circular section shafts and 20 mm in 

the event of a square section shaft (Fig. 1-23).

- Maximum 2 changes of direction are allowed 

on the vertical section of the flue system with 

a maximum clearance angle of 30° with respect 

to the vertical.

-  The maximum vertical extension using a 

Ø

 60 

ducting system is 13 m, the maximum exten-

sion includes 1 bend 

Ø

 60/10 at 90°, 1 m of 

horizontal pipe 60/100, 1 90° ducted bend 

Ø

 

60 and the roof terminal for ducting. 

  To determine the C

93 

flue system in configura-

tions other than that described (Fig. 1-25) 

one must consider that 1 metre of ducted pipe 

according to the indications described has a 

resistance factor equal to 4.9.

-  The maximum vertical extension using a 

Ø

 80 

ducting system is 28 m, the maximum exten-

sion includes 1 adapter 60/100 to 80/125,  1 87° 

bend 

Ø

 80/125, 1 m of horizontal pipe 80/125, 

1 90° ducted bend 

Ø

 80 and the roof terminal 

for ducting. 

  To determine the C

93 

flue system in configura-

tions other than that described (Fig. 1-25) one 

must consider the following pressure drops:

  - 1 m of concentric pipe 

Ø

 80/125 = 1 m of 

ducted pipe;

  - 1 87° bend = 1.4 m of ducted pipe;
  Consequently one must subtract the equivalent 

length of the part added to the 28 m available.

Summary of Contents for Victrix Maior 28 TT 1 ErP

Page 1: ...VICTRIX MAIOR 28 35 TT 1 ERP IE Instruction and recommendation booklet 1 038659ENG...

Page 2: ......

Page 3: ...onal limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions and by an authorised company...

Page 4: ...on recommendations 5 1 2 Main dimensions 6 1 3 Antifreeze protection 6 1 4 Boiler connection unit 7 1 5 Gas connection 7 1 6 Hydraulic connection 7 1 7 Electric connection 8 1 8 Remote controls and ro...

Page 5: ...boilerforpossiblewater and flue removal connections Keep all flamma ble objects away from the appliance paper rags plastic polystyrene etc Do not place household appliances underneath the boiler as th...

Page 6: ...ary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollution class of water 2 EN 1717 2002 or local regula tions in force Atte...

Page 7: ...n compliance with the tech nical standards in force in order to protect the system and the appliance from deposits e g scale slurry or other hazardous deposits In order not to void the heat exchanger...

Page 8: ...d assembly instructions contained in the acces sory kit On Off Immergas digital chrono thermostat The chrono thermostat allows set two room temperature value one for daytime comfort temperature and on...

Page 9: ...e always operates when con nected regardless of the presence or type of room chrono thermostat used and can work in combi nation with Immergas chrono thermostats The correlation between system flow te...

Page 10: ...ctor allowed corresponds to the resistance encountered with the maximum allowed pipe length for each type of Terminal Kit This information allows calculations to be made to verify the possibility of s...

Page 11: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m...

Page 12: ...s present in the kit positioning the relevant gaskets Engage the 90 80 bend with the male end smooth in the female end with lip seal of the 80 flange unit until it stops Introduce the gasket making it...

Page 13: ...the circular projections down wards in contact with the boiler flange and tighten using the screws present in the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female...

Page 14: ...cal length of 14 4 m including the terminal This configuration corresponds to a resistance factor of 100 In this case specific extensions must be requested Vertical kit with aluminium tile 80 125 Kit...

Page 15: ...t Remove the flat flange present in the lateral hole with respect to the central one ac cording to needs and replace it with the flange 3 positioningthegasket 2 alreadypresentin the boiler and tighten...

Page 16: ...xternal pipe must be fitted on the adaptor until it stops 1 N B to encourage the removal of possible condensate forming in the exhaust pipe tilt the pipes towards the boiler with a minimum slope of 1...

Page 17: ...ed inside buildings in 23 or B53 mode in this case all technical rules and national and local regulations in force must be complied with type B open chamber boilers must not be installed in places whe...

Page 18: ...non treated water To prevent corrosion the water system s PH should be between 6 5 and 8 5 Check the maximum content of chlorides which should be less than 250 mg l N B for quantities and methods of u...

Page 19: ...ble to the system Head kPa A B Head available with by pass closed B Head available with by pass open C D Power absorbed by the pump with by pass open dotted area D Power absorbed by the pump with by p...

Page 20: ...ty the entire system Moreover the version with filter preserves the functioning characteristics of the boiler thanks to its inspectionable filter Polyphosphate dispenser kit on request The polyphospha...

Page 21: ...check that the air intake flue exhaust terminals if fitted are not blocked If temporary shutdown of the boiler is required proceed as follows a drain the heating system if antifreeze is not used b shu...

Page 22: ...perating mode This function is always active and combined with the Solar ignition delay with time set above 0 seconds it manages the ignition of the boiler according to the domestic hot water inlet te...

Page 23: ...e on and off again the 5 attempts are re acquired 10 Insufficient system pressure Water pressure inside the central heating circuit that is sufficient to guarantee the correct operation of the boiler...

Page 24: ...ment it is only possible to control the system by means of the control panel of the boiler itself Check operation of the Wireless CAR checkthebatterycharge refertotherelative instructions booklet 59 M...

Page 25: ...ler restarts without having to be reset 98 Block maximum no of software errors The maximum number of software errors possible has been reached Press the Reset button 1 99 General block A boiler anomal...

Page 26: ...osed 2 10 ANTI FREEZE PROTECTION The Victrix Maior 28 35 TT 1 ErP series boiler has an anti freeze function that switches the burner on automatically when the temperature falls below 4 C standard prot...

Page 27: ...commission the boiler ensure that the type of gas used corresponds to the boiler settings the type of gas appears on the display on first electrical power supply or by checking the relative parameter...

Page 28: ...ow probe B2 Domestic hot water probe B4 External probe optional B5 Return probe B6 Domestic hot water flow meter B9 Domestic hot water inlet probe B10 Flue probe B24 Safety flow probe E3 Ignition and...

Page 29: ...closed and also the functionality of the pump Drain trap clogged This may be caused by dirt or combustion products deposited inside Check that there are no residues of material blocking the flow of co...

Page 30: ...o clock position Fig 3 5 and press the Reset button for about 8 seconds until the chimney sweep function is activated then press the summer winter button within 3 seconds Nominalheatoutput with the f...

Page 31: ...3 seconds 3 9 Once the function is active the boiler sequential ly carries out the procedures required to calibrate the appliance with the nominal intermediate and minimum heat output values At this...

Page 32: ...fgas parameter G and by restoring it according to the actual operating conditions wait for approximately 10 seconds between the gas change and the when it is restored 3 13 The restored values will be...

Page 33: ...odel 6 Do not use on this boiler model 7 Do not use on this boiler model 0 7 1 P4 Relay 2 optional The boiler is set up for functioning with the relay P C B optional which can be configured 0 Off 1 Ge...

Page 34: ...hanging the operating mode in order to quickly and comfortably satisfy an additional request for domestic hot water 0 100 seconds step 10 sec 2 t5 Central heating ignitions timer The boiler has electr...

Page 35: ...ised value F0 Equivalent length flue Defines the length of the flue see par 3 11 0 2 0 F1 Not used on this boiler model In the event of an alteration anomaly E72 appears and fast calibration is requir...

Page 36: ...the sealed chamber Check contents of the condensate drain trap Check that there are no residues of material clogging the condensate passage also check that the entire condensate drainage circuit is cl...

Page 37: ...o screws a 2 Press the hooks inwards which block the lower grid b 3 remove the grid b Front panel Fig 3 15b 4 Open the protection door e1 pulling it towards you 5 Remove the cover caps c and loosen sc...

Page 38: ...STALLER USER MAINTENANCE TECHNICIAN Ref X Control panel Fig 3 15d 9 Press the hooks on the side of the control panel i 10 Tilt the control panel i towards you Sides Fig 3 15e 11 Loosen screws k of sid...

Page 39: ...2 1 09 0 80 9 0 7740 28 0 98 0 72 8 0 6880 24 0 87 0 64 7 0 6020 19 0 76 0 56 6 0 5160 15 0 65 0 48 5 0 4300 10 0 54 0 40 4 0 3440 6 0 44 0 32 3 0 2580 4 0 33 0 24 2 8 2408 1 0 30 0 22 Victrix Maior 3...

Page 40: ...25 Flue temperature at nominal output C 51 52 Flue temperature at minimum output C 45 45 Victrix Maior 35 TT 1 ErP Gas nozzle diameter mm 6 15 6 15 Flue flow rate at nominal heat output kg h 55 56 Flu...

Page 41: ...loss at flue with burner On Off 80 60 C 0 02 2 00 0 01 2 00 Central heating circuit max operating pressure bar 3 3 Maximum heating temperature C 90 90 Adjustable heating temperature max operation fie...

Page 42: ...N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn max CH maximum heat i...

Page 43: ...means 60 C on return and 80 C on flow Low temperature mode for condensation Boilers means 30 C for low temperature boilers 37 C and for other appliances 50 C of return tempera ture Model s Victrix Mai...

Page 44: ...tion AFC 17 GJ Seasonal space heating energy efficiency s 93 Water heating energy efficiency wh 85 Parameter value Annual energy consumption for the heat ing function QHE 58 4 GJ Annual electricity co...

Page 45: ...fiche of boiler Supplementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature he...

Page 46: ...om fiche of heat pump The energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficiency is i...

Page 47: ...contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Auxiliary electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100...

Page 48: ...ing energy efficiency under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 ___ 2 1 1 x ___ 10 x ___ ____ ____ Auxi...

Page 49: ...49...

Page 50: ...50...

Page 51: ...51...

Page 52: ...mmergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 038659ENG rev ST 001862 004 07...

Reviews: