12
C12
1-11
1-12
1-13
C12
C12
1-14
C12
5
4
3
1
2
1
2
3
4
5
6
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
The kit includes:
N° 1 - Gasket (1)
N° 1 - Concentric bend Ø 60/100 (2)
N° 1 - Int./exhaust concentric terminal Ø 60/100 (3)
N° 1 - Internal wall sealing plate (4)
N° 1 - External wall sealing plate (5)
The kit includes:
N° 1 - Gasket (1)
N° 1 - Concentric bend Ø 60/100 (2)
N° 1 - Adaptor Ø 80/125 (3)
N° 1 - Int./exhaust concentric terminal Ø 80/125 (4)
N° 1 - Internal wall sealing plate (5)
N° 1 - External wall sealing plate (6)
1.9 CONCENTRIC HORIZONTAL KIT
INSTALLATION.
Type C configuration, sealed chamber and
fan assisted.
This terminal is connected directly to the outside
of the building for air intake and flue exhaust. The
horizontal kit can be installed with the rear, right
side, left side or front outlet. For installation with
frontal outlet, one must use the fixing plate and
a concentric bend coupling in order to ensure
sufficient space to carry out the tests required
by law upon commissioning.
Horizontal intake - exhaust kit Ø60/100.
Kit as-
sembly (Fig. 1-11): install the bend with flange (2)
onto the central hole of the boiler inserting the
gasket (1) and tighten using the screws included
in the kit. Couple the concentric terminal pipe Ø
60/100 (3) with the male end (smooth) into the
female end (with lip seals) of the bend (2) up to
the stop, making sure that the internal and ex-
ternal wall sealing plate have been fitted, this will
ensure sealing and joining of the kit elements.
• Extensions for horizontal kit Ø 60/100
(Fig. 1-12). The kit with this configuration can
be extended up to a
max. horizontal length of 3
m
including the terminal with grid and exclud-
ing the concentric bend leaving the boiler. This
configuration corresponds to a resistance factor
of 100. In this case the special extensions must
be requested.
Horizontal intake - exhaust kits Ø80/125.
Kit
assembly (Fig. 1-13): install the bend with flange
(2) onto the central hole of the boiler inserting
the gasket (1) and tighten using the screws in the
kit. Fit the male end (smooth) of the adapter (3)
up to the end stop on the female side of the bend
(2) (with lip seal). Fit the Ø 80/125 (4) concentric
terminal pipe with the male end (smooth) to the
female end of the adapter (3) (with lip gasket) up
to the stop; making sure that the internal and
external wall sealing plates have been fitted; this
will ensure sealing and joining of the elements
making up the kit.
• Extensions for horizontal kit Ø 80/125
(Fig. 1-14). The kit with this configuration
can be extended up to a
a maximum length of
7.3 m
, including the terminal with grid and
excluding the concentric bend leaving the
boiler and the adapter Ø 60/100 in Ø 80/125.
This configuration corresponds to a resistance
factor of 100. In this case the special extensions
must be requested.
Summary of Contents for NIKE MYTHOS 24 2E Series
Page 1: ...EOLO MYTHOS 24 2E IE Instruction and warning book 1 038791ENG ...
Page 2: ......
Page 31: ...31 ...