12
Procedure:
SR - R - P
Procedure:
DCC
Burners SR – R – P:
• unscrew injectors “U” using a 7mm spanner (fig. 1) and replace them with those for
the new gas according to table number 2 on page 20.
DCC – Dual burners
• unscrew the 2 screws “P” and remove cover “C” fig.2.
• unscrew injectors “U” using a 7 mm spanner (fig.3, fig.4) and replace them with
those for the new gas according to table number 1 below 13.
LPG CONVERSION
Replacement of the injectors for all models
2
1
3
4
U
U
U
Summary of Contents for MAJESTIC MILANO 06
Page 2: ...2 ...
Page 20: ...20 WIRING DIAGRAM INDUCTION HOB AREA 5 INDUCTION HOB AREA 6 ...
Page 21: ...21 WIRING DIAGRAM P 06 07 30 08 09 E3 L 06 09 MP ...
Page 22: ...22 WIRING DIAGRAM WIRING DIAGRAM P 06 07 30 08 09 H3 ...
Page 26: ...26 WIRING DIAGRAM LD 09 10 MP M12 E3 ...
Page 30: ...WIRING DIAGRAM P15 E3 ...
Page 31: ...WIRING DIAGRAM PD 09 10 I E3 PD 09 10 E3 ...
Page 34: ...NOTES ...
Page 35: ......