
19
GB
Personal protection - preparing for operational readiness
Please note:
Please note: operational readiness requires that the IKAR sleeve has already been installed prop
-
erly. Note whether it is horizontal or vertical.
Insert the cantilever arm into the IKAR sleeve.
Release the socket pin (
A
) by pressing the pressure pin with the thumb and pull out.
Then fold the cantilever arm upwards (
B
) and secure with the socket pin (
C
).
The ASS-3 cantilever arm is now ready for basic use.
It is disassembled in the reverse sequence.
A
B
C
Similar to illustration
Summary of Contents for ASS-3
Page 4: ...4...
Page 12: ...12...
Page 89: ...89 IKAR IKAR A B C ASS 3 A B C GR...
Page 90: ...90 1 2 3 4 5 HRA HRA IKAR PLW IKAR 2 IKAR HRA 2 2 HRA 1 3 4 IKAR 5 3 4 GR...
Page 92: ...92 2 3 2 1 2 1 2 HRA...
Page 93: ...93...
Page 94: ...94...
Page 95: ...95...