Rev.
29/09/2020
Instron 3365 Load cell switching guide
3.
Loosen the screw on top of the machine bar with the 8 mm hex key. Hold the cell from the bottom
to avoid it fall!
4.
Locate and remove the alignment ring and the anti-rotation pin
5.
Place the 2 KN cell at the back of the machine working plane, or the 10 N cell in its box
6.
Insert the ring and pin in the cell to be mounted. Check for the hole marked in
green
on the 10 N
cell