background image

Rev. 
29/09/2020

 

Instron 3365 Load cell switching guide

 

 

 

3.

 

Loosen the screw on top of the machine bar with the 8 mm hex key. Hold the cell from the bottom 
to avoid it fall! 

 

4.

 

Locate and remove the alignment ring and the anti-rotation pin 

 

5.

 

Place the 2 KN cell at the back of the machine working plane, or the 10 N cell in its box 

6.

 

Insert the ring and pin in the cell to be mounted. Check for the hole marked in 

green 

on the 10 N 

cell 

Reviews: