![IINNO Energy Storion-SMILE-B3 Installation & Operation Manual Download Page 13](http://html1.mh-extra.com/html/iinno-energy/storion-smile-b3/storion-smile-b3_installation-and-operation-manual_623819013.webp)
___________________________________________________________________
Page 11 of
29
Introduction
Figure 1.3 Storion-SMILE-B3 Front View
Figure 1.4 Storion-SMILE-B3 Left View
Table 4 Ports Definition
Name
Description
BMS
Additional battery BMS communicate cable connect
DRMs
DRED connect port (only for AU)
CT1
PV CT communicate cable
CT2
Grid CT communication cable
BAT+
Additional battery power positive cable connect
BAT-
Additional battery power negative cable connect
BACKUP Critical load connect
80A battery DC Isolator