
1 – 3
ᵏ
SAFETY
PERFORM “WALK-AROUND”
INSPECTION.
Walk around the machine to check safety
guards, plates, and other related parts are set
in place. Do not attempt to operate the
machine when any unsafe condition is
detected.
NEVER ASSUME ANYTHING
GUARANTEED.
Never assume that everything is all right at
the start of a work day just because it seemed
satisfactory at the end of the previous work
day. Before beginning each days operation,
thoroughly inspect the entire excavator for
signs of vandalism.
MAKE A WORK PLAN.
Prior to operation, investigate your job site
sufficiently. When any obstruction or hazards
are detected, mark it so that all personnel are
aware of it. Avoid any oversight that may cause
serious accident.
Observe a local weather forecast and discuss
well work procedures and let all personnel
know them without exception.
Summary of Contents for 55N3
Page 1: ...SERIAL NUMBER WP003001 55N3 PUB 1 OPERATION MANUAL 0903 ENG ...
Page 2: ......
Page 42: ...1 36 ᵏ SAFETY This page left intentionally blank ...
Page 102: ...3 32 ᵑ MAINTENANCE This page left intentionally blank ...
Page 104: ...4 2 ᵒ TROUBLE SHOOTING This page left intentionally blank ...
Page 106: ...5 2 ᵓ HYDRAULIC SYSTEM DIAGRAM This page left intentionally blank ...