
1 – 4
ᵏ
SAFETY
WATCH FOR UNDERGROUND UTILTIES.
Mark the location of underground utilities
such as gas lines, sewers, and power lines
before any digging operations.
If necessary, the utilities should be
temporarily discontinued.
CHECK THE JOB SITE.
ALWAYS
check the job site for grade and
stability of the ground, ventilation, depth of
water and ambient obstructions.
Avoid operating your equipment too close to
an overhang.
Since this machine is not provided with anti-
explosion design,
NEVER
use it inside a
tunnel or in explosive environment to avoid
hazard caused by an explosion.
CLEAR ALL PERSONNEL FROM THE
MACHINE AND AREA.
Be sure to barricade the job site to prevent
entry of the unauthorized. Confirm that there
is no one around the machine before starting
the engine or operating the machine.
Summary of Contents for 55N3
Page 1: ...SERIAL NUMBER WP003001 55N3 PUB 1 OPERATION MANUAL 0903 ENG ...
Page 2: ......
Page 42: ...1 36 ᵏ SAFETY This page left intentionally blank ...
Page 102: ...3 32 ᵑ MAINTENANCE This page left intentionally blank ...
Page 104: ...4 2 ᵒ TROUBLE SHOOTING This page left intentionally blank ...
Page 106: ...5 2 ᵓ HYDRAULIC SYSTEM DIAGRAM This page left intentionally blank ...