Machine Installation
19
Lightbox acrylic board name of machine assembly:
❶
Secure the machine name holder, machine
name holder B, LOGO front grid acrylic,
and machine name disc with 8 M4 screws.
❷
Secure the assembled LOGO front grid
acrylic and LOGO acrylic with 10 M4
screws.
❸
Secure the assembled LOGO acrylic and
screen holder with 2 M4 screws and 4 mirror
bead screws.
❹
Secure the top decorative cardboard and
screen holder with 4 M4 screws.
Machine Installation